Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,930
matching recommendationsSIC | 203 | Preserved Fruits And Vegetables |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0355 # 03 Y:2004 | 03 | 2004 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $12,422 | $17 | Implemented |
IA0355 # 04 Y:2004 | 04 | 2004 | REDUCE EXCESSIVE BOILER BLOWDOWN | $8,646 | $2 | Implemented |
IA0355 # 05 Y:2004 | 05 | 2004 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $9,161 | $3 | Implemented |
IA0355 # 06 Y:2004 | 06 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $540 | $359 | Implemented |
IA0355 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $956 | $230 | Implemented |
IA0355 # 08 Y:2004 | 08 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,227 | $3 | Not Implemented |
IA0355 # 09 Y:2004 | 09 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,817 | $1 | Not Implemented |
IA0355 # 10 Y:2004 | 10 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,274 | $3,116 | Not Implemented |
IA0355 # 11 Y:2004 | 11 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,521 | $2 | Implemented |
IA0355 # 12 Y:2004 | 12 | 2004 | INSTALL OCCUPANCY SENSORS | $334 | $616 | Not Implemented |
IA0355 # 13 Y:2004 | 13 | 2004 | ADD AREA LIGHTING SWITCHES | $1,045 | $689 | Not Implemented |
SU0198 # 01 Y:2004 | 01 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $7,681 | $0 | Implemented |
SU0198 # 02 Y:2004 | 02 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,671 | $133 | Implemented |
SU0198 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,691 | $736 | Implemented |
SU0198 # 04 Y:2004 | 04 | 2004 | INSTALL OCCUPANCY SENSORS | $925 | $401 | Not Implemented |
SU0198 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,416 | $883 | Implemented |
SU0198 # 06 Y:2004 | 06 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $25,497 | $15,000 | Implemented |
OK0695 # 01 Y:2004 | 01 | 2004 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $35,493 | $329,564 | Not Implemented |
OK0695 # 02 Y:2004 | 02 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,436 | $17,500 | Not Implemented |
OK0695 # 03 Y:2004 | 03 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,386 | $4,515 | Not Implemented |
OK0695 # 04 Y:2004 | 04 | 2004 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $10,723 | $21,750 | Implemented |
OK0695 # 05 Y:2004 | 05 | 2004 | COMBINE UTILITY METERS | $2,354 | $2,546 | Not Implemented |
OK0695 # 06 Y:2004 | 06 | 2004 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $6,830 | $0 | Implemented |
OK0695 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,073 | $23,985 | Not Implemented |
OR0467 # 01 Y:2004 | 01 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $148,000 | $50 | Not Implemented |