Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
562
matching recommendationsSIC | 203 | Preserved Fruits And Vegetables |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0419 # 04 Y:2009 | 04 | 2009 | INCREASE AMOUNT OF CONDENSATE RETURNED | $15,940 | $2,263 | Implemented |
SD0419 # 05 Y:2009 | 05 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $49,905 | $161,162 | Implemented |
SD0419 # 06 Y:2009 | 06 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $39,102 | $50,136 | Not Implemented |
SD0419 # 07 Y:2009 | 07 | 2009 | INSTALL TIMERS AND/OR THERMOSTATS | $14,906 | $500 | Not Implemented |
SF0374 # 01 Y:2009 | 01 | 2009 | REPAIR AND ELIMINATE STEAM LEAKS | $45,410 | $0 | Implemented |
SF0374 # 02 Y:2009 | 02 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,699 | $0 | Implemented |
SF0374 # 03 Y:2009 | 03 | 2009 | REDUCE EXCESSIVE BOILER BLOWDOWN | $10,627 | $2,372 | Implemented |
SF0374 # 04 Y:2009 | 04 | 2009 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $9,963 | $2,837 | Implemented |
SF0374 # 05 Y:2009 | 05 | 2009 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $5,402 | $3,037 | Implemented |
SF0374 # 06 Y:2009 | 06 | 2009 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $15,888 | $9,574 | Implemented |
SF0374 # 07 Y:2009 | 07 | 2009 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $17,939 | $12,500 | Implemented |
SF0374 # 08 Y:2009 | 08 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $48,237 | $33,968 | Implemented |
SF0374 # 09 Y:2009 | 09 | 2009 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $51,835 | $40,007 | Implemented |
SF0374 # 10 Y:2009 | 10 | 2009 | USE PHOTOCELL CONTROLS | $18,403 | $18,196 | Implemented |
SF0374 # 11 Y:2009 | 11 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,553 | $5,659 | Implemented |
SF0374 # 12 Y:2009 | 12 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,489 | $4,385 | Implemented |
SF0374 # 13 Y:2009 | 13 | 2009 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,217 | $4,719 | Implemented |
SF0374 # 14 Y:2009 | 14 | 2009 | INSTALL OCCUPANCY SENSORS | $701 | $1,567 | Implemented |
SF0374 # 15 Y:2009 | 15 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,809 | $31,988 | Not Implemented |
SF0374 # 16 Y:2009 | 16 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,002 | $318 | Implemented |
SF0374 # 17 Y:2009 | 17 | 2009 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $89,029 | $326,072 | Implemented |
SF0374 # 18 Y:2009 | 18 | 2009 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $16,622 | $86,476 | Implemented |
SF0374 # 19 Y:2009 | 19 | 2009 | RECOVER AND REUSE COOLING WATER | $23,524 | $15,018 | Not Implemented |
SD0389 # 01 Y:2006 | 01 | 2006 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $231,300 | $1,500,000 | Not Implemented |
SD0389 # 02 Y:2006 | 02 | 2006 | USE PHOTOCELL CONTROLS | $846 | $480 | Implemented |