IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

394

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0780 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,517 $4,115 n/a
OR0780 # 01 Y:2023 01 2023 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $35,316 $540,000 n/a
OR0780 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $1,666 $24,285 n/a
OR0780 # 03 Y:2023 03 2023 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $2,453 $14,157 n/a
OR0775 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $563 $261 n/a
OR0775 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $2,277 $41,745 n/a
OR0775 # 01 Y:2023 01 2023 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $174,406 $233,000 n/a
OR0773 # 04 Y:2023 04 2023 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,262 $12,121 n/a
OR0773 # 03 Y:2023 03 2023 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $8,507 $13,124 n/a
OR0773 # 01 Y:2023 01 2023 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $5,439 $1,278 n/a
OR0773 # 02 Y:2023 02 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $1,051 $797 n/a
OR0757 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,612 $0 Not Implemented
OR0757 # 04 Y:2022 04 2022 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $194,400 $300,000 Not Implemented
OR0757 # 03 Y:2022 03 2022 INSTALL AUTOMATIC PACKING EQUIPMENT $97,200 $50,000 Not Implemented
OR0757 # 02 Y:2022 02 2022 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $26,900 $0 Not Implemented
OR0704 # 05 Y:2018 05 2018 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $12,192 $2,161 Not Implemented
OR0704 # 06 Y:2018 06 2018 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $5,586 $14,266 Not Implemented
OR0704 # 04 Y:2018 04 2018 MINIMIZE WATER USAGE $28,545 $540 Not Implemented
OR0704 # 03 Y:2018 03 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $40,837 $72,155 Not Implemented
OR0704 # 02 Y:2018 02 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $127,144 $201,450 Implemented
OR0704 # 01 Y:2018 01 2018 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $510,333 $740,000 Not Implemented
OR0694 # 03 Y:2017 03 2017 INSTALL BACK-UP EQUIPMENT $219,130 $45,000 Not Implemented
OR0694 # 06 Y:2017 06 2017 MINIMIZE WATER USAGE $8,079 $15,125 Not Implemented
OR0694 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,605 $10,606 Not Implemented
OR0694 # 04 Y:2017 04 2017 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $29,962 $12,100 Not Implemented