Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
63
matching recommendationsSIC | 203 | Preserved Fruits And Vegetables |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0287 # 10 Y:2015 | 10 | 2015 | USE PHOTOCELL CONTROLS | $184 | $600 | Implemented |
MI0287 # 09 Y:2015 | 09 | 2015 | INSTALL OCCUPANCY SENSORS | $397 | $709 | Implemented |
MI0287 # 08 Y:2015 | 08 | 2015 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $907 | $336 | Not Implemented |
MI0287 # 07 Y:2015 | 07 | 2015 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,047 | $280 | Not Implemented |
MI0287 # 06 Y:2015 | 06 | 2015 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,450 | $3,140 | Implemented |
MI0287 # 05 Y:2015 | 05 | 2015 | USE OPTIMUM THICKNESS INSULATION | $2,395 | $8,535 | Not Implemented |
MI0287 # 04 Y:2015 | 04 | 2015 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $5,439 | $160 | Not Implemented |
MI0287 # 01 Y:2015 | 01 | 2015 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $15,717 | $1,400 | Not Implemented |
MI0287 # 02 Y:2015 | 02 | 2015 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $10,892 | $10,800 | Implemented |
MI0287 # 03 Y:2015 | 03 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,014 | $4,218 | Implemented |
DL0151 # 02 Y:2015 | 02 | 2015 | MINIMIZE OVERFLOWS BY INSTALLING LEVEL CONTROLS | $37,680 | $12,400 | Not Implemented |
DL0151 # 06 Y:2015 | 06 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,550 | $14,400 | Not Implemented |
DL0151 # 01 Y:2015 | 01 | 2015 | USE CORRECT SIZE STEAM TRAPS | $12,870 | $2,380 | Not Implemented |
DL0151 # 07 Y:2015 | 07 | 2015 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $1,970 | $4,480 | Not Implemented |
DL0151 # 03 Y:2015 | 03 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $60,250 | $20,000 | Not Implemented |
DL0151 # 05 Y:2015 | 05 | 2015 | UPGRADE CONTROLS ON COMPRESSORS | $7,730 | $11,520 | Not Implemented |
DL0151 # 08 Y:2015 | 08 | 2015 | MINIMIZE WATER USAGE | $80,640 | $200,250 | Not Implemented |
DL0151 # 04 Y:2015 | 04 | 2015 | OPERATE BOILERS ON HIGH FIRE SETTING | $10,860 | $4,610 | Not Implemented |
OR0653 # 06 Y:2015 | 06 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,625 | $1,000 | Not Implemented |
OR0653 # 05 Y:2015 | 05 | 2015 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,262 | $15,398 | Not Implemented |
OR0655 # 02 Y:2015 | 02 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,161 | $1,000 | Implemented |
OR0653 # 04 Y:2015 | 04 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $611 | $1,058 | Not Implemented |
OR0655 # 09 Y:2015 | 09 | 2015 | USE SOLAR HEAT TO MAKE ELECTRICTY | $2,480 | $20,979 | Not Implemented |
OR0655 # 06 Y:2015 | 06 | 2015 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $180,695 | $251,760 | Not Implemented |
OR0655 # 05 Y:2015 | 05 | 2015 | FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM | $15,571 | $19,050 | Not Implemented |