Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
48
matching recommendationsSIC | 203 | Preserved Fruits And Vegetables |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0590 # 05 Y:2024 | 05 | 2024 | REDUCE HEAT GAIN BY WINDOW TINTING | $196 | $299 | n/a |
AS0590 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,358 | $1,128 | n/a |
AS0590 # 03 Y:2024 | 03 | 2024 | PAY BILLS ON TIME TO AVOID LATE FEES | $3,038 | $39 | n/a |
AS0590 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $17,979 | $93,198 | n/a |
AS0590 # 01 Y:2024 | 01 | 2024 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $33,333 | $1,245 | n/a |
UU0259 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $221,450 | $2,473,450 | n/a |
UU0259 # 01 Y:2024 | 01 | 2024 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $3,866,540 | $17,885,484 | n/a |
UU0259 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $68,165 | $110,030 | n/a |
UU0259 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $205,038 | $1,865,253 | n/a |
UU0259 # 05 Y:2024 | 05 | 2024 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $53,643 | $33,000 | n/a |
UU0259 # 06 Y:2024 | 06 | 2024 | INSTALL COMMON HEADER ON COMPRESSORS | $3,995 | $9,200 | n/a |
LS2413 # 01 Y:2024 | 01 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $68,225 | $155,400 | n/a |
LS2413 # 02 Y:2024 | 02 | 2024 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $5,076 | $16,000 | n/a |
LS2413 # 03 Y:2024 | 03 | 2024 | INSTALL SENSORS TO DETECT DEFECTS | $5,700 | $30,000 | n/a |
UL2406 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $7,741 | $12,220 | n/a |
UL2406 # 09 Y:2024 | 09 | 2024 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $35,350 | $159,350 | n/a |
UL2406 # 08 Y:2024 | 08 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $78,236 | $775,946 | n/a |
UL2406 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,544 | $12,225 | n/a |
UL2406 # 06 Y:2024 | 06 | 2024 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $4,470 | $1,120 | n/a |
UL2406 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,826 | $10,980 | n/a |
UL2406 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $112 | $406 | n/a |
UL2406 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,721 | $15,563 | n/a |
UL2406 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $21,720 | $14,950 | n/a |
IC0304 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $577 | $976 | n/a |
IC0304 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $335,865 | $2,216,227 | n/a |