IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

124

matching recommendations
Reset
SIC 2032 Canned Specialties
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0037 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,719 $180 Implemented
MU0037 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $65,091 $242,014 Implemented
MU0037 # 05 Y:2023 05 2023 INCREASE AMOUNT OF CONDENSATE RETURNED $104,339 $0 Implemented
UU0179 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,013 $6,614 Implemented
UU0179 # 05 Y:2021 05 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,131 $100 Implemented
UU0179 # 02 Y:2021 02 2021 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $27,935 $2,000 Implemented
OR0704 # 02 Y:2018 02 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $127,144 $201,450 Implemented
SU0426 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $6,669 $7,515 Implemented
SU0426 # 04 Y:2016 04 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,690 $110,000 Implemented
OR0655 # 02 Y:2015 02 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,161 $1,000 Implemented
SD0491 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $310 $200 Implemented
MZ0132 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,108 $1,630 Implemented
MZ0132 # 13 Y:2013 13 2013 INSTALL OCCUPANCY SENSORS $1,565 $640 Implemented
MZ0132 # 08 Y:2013 08 2013 REDUCE EXCESSIVE BOILER BLOWDOWN $4,877 $2,600 Implemented
MZ0132 # 15 Y:2013 15 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $791 $1,000 Implemented
MZ0132 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,152 $12,430 Implemented
MZ0132 # 14 Y:2013 14 2013 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $865 $635 Implemented
MZ0132 # 09 Y:2013 09 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,603 $3,100 Implemented
MZ0132 # 02 Y:2013 02 2013 INCREASE AMOUNT OF CONDENSATE RETURNED $28,581 $40,000 Implemented
DL0113 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,030 $18,354 Implemented
DL0113 # 04 Y:2013 04 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $2,800 $7,588 Implemented
DL0113 # 02 Y:2013 02 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $3,884 $2,770 Implemented
LE0357 # 03 Y:2013 03 2013 INSTALL TIMERS AND/OR THERMOSTATS $992 $225 Implemented
LE0357 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,062 $3,910 Implemented
LE0357 # 08 Y:2013 08 2013 REPAIR AND ELIMINATE STEAM LEAKS $1,285 $4,500 Implemented