IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
SIC 2033 Canned Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0154 # 01 Y:1998 01 1998 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $3,242 $0 Implemented
SF0154 # 02 Y:1998 02 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $112,256 $73,966 Not Implemented
SF0154 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,646 $4,900 Implemented
SF0154 # 06 Y:1998 06 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,837 $5,310 Not Implemented
SF0154 # 07 Y:1998 07 1998 INCREASE AMOUNT OF CONDENSATE RETURNED $3,288 $6,477 Not Implemented
SF0154 # 05 Y:1998 05 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,270 $17,928 Not Implemented
SF0154 # 09 Y:1998 09 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,664 $4,281 Implemented
SF0154 # 08 Y:1998 08 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,681 $9,290 Implemented
SF0154 # 04 Y:1998 04 1998 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $15,577 $17,000 Not Implemented
SF0154 # 11 Y:1998 11 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,965 $24,395 Not Implemented
SF0154 # 10 Y:1998 10 1998 USE PHOTOCELL CONTROLS $1,549 $9,500 Implemented
DS0124 # 02 Y:1998 02 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,039 $2,213 Not Implemented
DS0124 # 06 Y:1998 06 1998 INCREASE USE OF AUTOMATION $15,206 $40,000 Not Implemented
DS0124 # 05 Y:1998 05 1998 INCREASE USE OF AUTOMATION $6,750 $10,000 Not Implemented
DS0124 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $15,838 $30,000 Not Implemented
DS0124 # 03 Y:1998 03 1998 OPTIMIZE PLANT POWER FACTOR $30,549 $25,900 Implemented
DS0124 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,385 $21,938 Implemented
UF0204 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,991 $5,652 Implemented
UF0204 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,088 $792 Not Implemented
UF0204 # 04 Y:1998 04 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $980 $1,000 Implemented
UF0204 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,777 $4,604 Not Implemented
UF0204 # 05 Y:1998 05 1998 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $46,067 $116,000 Implemented
UF0204 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,919 $1,200 Implemented
UF0204 # 08 Y:1998 08 1998 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $28,601 $2,500 Not Implemented
UF0204 # 07 Y:1998 07 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,380 $0 Not Implemented