IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 2033 Canned Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0382 # 06 Y:2000 06 2000 ELIMINATE A BY-PRODUCT $68,235 $2,000 Implemented
OR0382 # 05 Y:2000 05 2000 OPTIMIZE PLANT POWER FACTOR $2,241 $6,400 Not Implemented
OR0382 # 04 Y:2000 04 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,050 $4,653 Not Implemented
OR0382 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,194 $2,979 Not Implemented
OR0382 # 01 Y:2000 01 2000 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $26,817 $900 Implemented
OR0382 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $15,208 $26,491 Implemented
OR0381 # 02 Y:2000 02 2000 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $699 $300 Implemented
OR0381 # 01 Y:2000 01 2000 IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM $27,260 $0 Implemented
OR0381 # 06 Y:2000 06 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $20,970 $40,500 Not Implemented
OR0381 # 05 Y:2000 05 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,096 $390 Implemented
OR0381 # 04 Y:2000 04 2000 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,850 $8,600 Implemented
OR0381 # 03 Y:2000 03 2000 INSULATE BARE EQUIPMENT $540 $345 Not Implemented
WI0383 # 06 Y:2000 06 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,257 $740 Implemented
WI0383 # 05 Y:2000 05 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,875 $0 Not Implemented
WI0383 # 04 Y:2000 04 2000 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,492 $11,550 Implemented
WI0383 # 03 Y:2000 03 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,946 $22,500 Implemented
WI0383 # 02 Y:2000 02 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,801 $20,000 Not Implemented
WI0383 # 01 Y:2000 01 2000 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $41,291 $72,000 Not Implemented
SF0190 # 07 Y:2000 07 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,968 $29,300 Not Implemented
SF0190 # 08 Y:2000 08 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $4,565 $0 Implemented
SF0190 # 09 Y:2000 09 2000 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $6,079 $0 Implemented
SF0190 # 10 Y:2000 10 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $42,263 $32,184 Implemented
SF0190 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,970 $1,123 Implemented
SF0190 # 05 Y:2000 05 2000 INSTALL OCCUPANCY SENSORS $6,043 $1,750 Implemented
SF0190 # 04 Y:2000 04 2000 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,090 $296 Not Implemented