IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

52

matching recommendations
Reset
SIC 2033 Canned Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0358 # 11 Y:2004 11 2004 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $1,223 $100 Implemented
IA0358 # 10 Y:2004 10 2004 INSTALL OCCUPANCY SENSORS $414 $924 Not Implemented
IA0358 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $930 $2,030 Not Implemented
IA0358 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,955 $3,368 Implemented
IA0358 # 07 Y:2004 07 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $633 $633 Implemented
IA0358 # 06 Y:2004 06 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,052 $609 Not Implemented
IA0358 # 05 Y:2004 05 2004 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $3,523 $1,800 Not Implemented
IA0358 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,528 $359 Implemented
IA0358 # 03 Y:2004 03 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,577 $1,000 Implemented
IA0358 # 02 Y:2004 02 2004 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $36,969 $18,000 Implemented
IA0358 # 01 Y:2004 01 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $24,532 $1,000 Implemented
IA0358 # 12 Y:2004 12 2004 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $3,166 $40 Implemented
SU0198 # 06 Y:2004 06 2004 UPGRADE CONTROLS ON COMPRESSORS $25,497 $15,000 Implemented
SU0198 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,416 $883 Implemented
SU0198 # 04 Y:2004 04 2004 INSTALL OCCUPANCY SENSORS $925 $401 Not Implemented
SU0198 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $7,681 $0 Implemented
SU0198 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,691 $736 Implemented
SU0198 # 02 Y:2004 02 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,671 $133 Implemented
LE0193 # 03 Y:2004 03 2004 REPAIR OR REPLACE STEAM TRAPS $17,227 $492 Implemented
LE0193 # 05 Y:2004 05 2004 RECOVER WASTE HEAT FROM EQUIPMENT $13,252 $10,720 Not Implemented
LE0193 # 06 Y:2004 06 2004 INSULATE FEEDWATER TANK $11,953 $4,508 Implemented
LE0193 # 04 Y:2004 04 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,446 $2,000 Implemented
LE0193 # 01 Y:2004 01 2004 CONVERT COMBUSTION EQUIPMENT TO BURN OIL $192,339 $50,000 n/a
LE0193 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $105,726 $58,053 n/a
LE0193 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,349 $3,768 Implemented