IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

175

matching recommendations
Reset
SIC 2034 Dehydrated Fruits, Vegetables, Soups
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0236 # 03 Y:2024 03 2024 INSULATE BARE EQUIPMENT $16,698 $11,570 n/a
UU0236 # 02 Y:2024 02 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $72,320 $46,000 n/a
UU0236 # 01 Y:2024 01 2024 REPLACE BOILER $208,300 $1,070,720 n/a
UU0236 # 04 Y:2024 04 2024 INSULATE BARE EQUIPMENT $5,640 $3,090 n/a
SF0581 # 08 Y:2022 08 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $202 $192 Not Implemented
SF0581 # 02 Y:2022 02 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $488 $0 Not Implemented
SF0581 # 04 Y:2022 04 2022 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $5,523 $1,537 Not Implemented
SF0581 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,255 $300 Not Implemented
SF0581 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,942 $0 Not Implemented
SF0581 # 10 Y:2022 10 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,991 $61,830 Not Implemented
SF0581 # 07 Y:2022 07 2022 REPAIR AND ELIMINATE STEAM LEAKS $2,960 $2,345 Not Implemented
SF0581 # 06 Y:2022 06 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,550 $1,334 Not Implemented
SF0581 # 09 Y:2022 09 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,582 $23,946 Not Implemented
SF0581 # 05 Y:2022 05 2022 INSULATE BARE EQUIPMENT $7,711 $3,227 Not Implemented
AS0505 # 01 Y:2021 01 2021 USE LESS WASTEFUL PACKAGING $178,199 $183,215 Implemented
AS0506 # 06 Y:2021 06 2021 INSTALL OCCUPANCY SENSORS $7,913 $1,399 Not Implemented
AS0506 # 05 Y:2021 05 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,417 $27,733 Not Implemented
AS0506 # 04 Y:2021 04 2021 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $11,446 $21,173 Not Implemented
AS0506 # 02 Y:2021 02 2021 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $32,780 $1,503 Not Implemented
AS0506 # 01 Y:2021 01 2021 COMBINE UTILITY METERS $83,765 $2,853 Not Implemented
AS0505 # 07 Y:2021 07 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,033 $3,432 Not Implemented
AS0505 # 06 Y:2021 06 2021 INSTALL OCCUPANCY SENSORS $1,149 $1,295 Not Implemented
AS0505 # 05 Y:2021 05 2021 KEEP EQUIPMENT CLEAN $4,063 $464 Implemented
AS0505 # 04 Y:2021 04 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,270 $200 Not Implemented
AS0505 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,366 $14,494 Not Implemented