IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
Reset
SIC 2035 Pickles, Sauces, And Salad Dressings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0286 # 01 Y:1997 01 1997 BURN WOOD BY-PRODUCTS FOR HEAT $907 $0 Implemented
OR0285 # 04 Y:1996 04 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,815 $0 Not Implemented
OR0285 # 06 Y:1996 06 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $686 $2,582 Not Implemented
OR0285 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,671 $15,663 Implemented
OR0285 # 03 Y:1996 03 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $36,382 $10,450 Implemented
OR0285 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN WATER LINES AND VALVES $464 $142 Implemented
OR0285 # 01 Y:1996 01 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $33,432 $0 Implemented
OR0261 # 05 Y:1996 05 1996 UTILIZE OXIDATION/REDUCTION FOR NEUTRALIZATION $92,431 $120,000 Implemented
OR0261 # 04 Y:1996 04 1996 OPTIMIZE PLANT POWER FACTOR $1,181 $4,000 Not Implemented
OR0261 # 03 Y:1996 03 1996 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $1,824 $4,012 Implemented
OR0261 # 02 Y:1996 02 1996 INSULATE FEEDWATER TANK $1,450 $2,383 Implemented
OR0261 # 01 Y:1996 01 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,791 $2,900 Not Implemented
OR0080 # 01 Y:1990 01 1990 REDUCE VENTILATION AIR $5,914 $0 Implemented
OR0080 # 02 Y:1990 02 1990 RECOVER WASTE HEAT FROM EQUIPMENT $1,416 $319 Not Implemented
OR0080 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,590 $1,500 Implemented
OR0080 # 05 Y:1990 05 1990 INSTALL SET-BACK TIMERS $569 $660 Implemented
OR0080 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $559 $660 Not Implemented
OR0080 # 04 Y:1990 04 1990 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,957 $0 Implemented
OR0051 # 03 Y:1989 03 1989 USE MINIMUM STEAM OPERATING PRESSURE $458 $0 Implemented
OR0051 # 01 Y:1989 01 1989 INSTALL SET-BACK TIMERS $14,990 $0 Implemented
OR0051 # 02 Y:1989 02 1989 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,926 $0 Implemented
OR0051 # 04 Y:1989 04 1989 INSTALL STEAM TRAP $23,375 $2,335 Implemented
OR0051 # 05 Y:1989 05 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $444 $500 Implemented
OR0051 # 06 Y:1989 06 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $467 $503 Implemented
OR0051 # 07 Y:1989 07 1989 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,450 $8,000 Not Implemented