Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsSIC | 2035 | Pickles, Sauces, And Salad Dressings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0598 # 07 Y:2017 | 07 | 2017 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $11,584 | $500 | Not Implemented |
NC0598 # 06 Y:2017 | 06 | 2017 | INSULATE BARE EQUIPMENT | $432 | $500 | Not Implemented |
NC0598 # 05 Y:2017 | 05 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $932 | $100 | Implemented |
NC0598 # 04 Y:2017 | 04 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,276 | $1,050 | Not Implemented |
NC0598 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,199 | $50 | Not Implemented |
NC0598 # 02 Y:2017 | 02 | 2017 | INSTALL OCCUPANCY SENSORS | $165 | $547 | Implemented |
NC0598 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,448 | $18,822 | Implemented |
NC0083 # 04 Y:1996 | 04 | 1996 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $859 | $30 | Not Implemented |
NC0083 # 09 Y:1996 | 09 | 1996 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $58,765 | $10,360 | Not Implemented |
NC0083 # 08 Y:1996 | 08 | 1996 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $1,683 | $2,500 | Not Implemented |
NC0083 # 07 Y:1996 | 07 | 1996 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,902 | $600 | Implemented |
NC0083 # 06 Y:1996 | 06 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,187 | $3,224 | Implemented |
NC0083 # 05 Y:1996 | 05 | 1996 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $605 | $600 | Not Implemented |
NC0083 # 03 Y:1996 | 03 | 1996 | USE PHOTOCELL CONTROLS | $2,242 | $660 | Implemented |
NC0083 # 02 Y:1996 | 02 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $108 | $560 | Implemented |
NC0083 # 01 Y:1996 | 01 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,850 | $1,578 | Implemented |
NC0052 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,358 | $2,000 | Implemented |
NC0052 # 09 Y:1995 | 09 | 1995 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $11,944 | $18,477 | Not Implemented |
NC0052 # 08 Y:1995 | 08 | 1995 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $71,177 | $500 | Not Implemented |
NC0052 # 07 Y:1995 | 07 | 1995 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,850 | $0 | Not Implemented |
NC0052 # 06 Y:1995 | 06 | 1995 | KEEP BOILER TUBES CLEAN | $8,880 | $0 | Implemented |
NC0052 # 05 Y:1995 | 05 | 1995 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $784 | $900 | Not Implemented |
NC0052 # 04 Y:1995 | 04 | 1995 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,703 | $15,000 | Not Implemented |
NC0052 # 03 Y:1995 | 03 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,087 | $120 | Implemented |
NC0052 # 02 Y:1995 | 02 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $403 | $100 | Implemented |