IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

309

matching recommendations
Reset
SIC 2037 Frozen Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0374 # 07 Y:2009 07 2009 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $17,939 $12,500 Implemented
SF0374 # 08 Y:2009 08 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $48,237 $33,968 Implemented
SF0374 # 09 Y:2009 09 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $51,835 $40,007 Implemented
SF0374 # 10 Y:2009 10 2009 USE PHOTOCELL CONTROLS $18,403 $18,196 Implemented
SF0374 # 11 Y:2009 11 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,553 $5,659 Implemented
SF0374 # 12 Y:2009 12 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,489 $4,385 Implemented
SF0374 # 13 Y:2009 13 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,217 $4,719 Implemented
SF0374 # 14 Y:2009 14 2009 INSTALL OCCUPANCY SENSORS $701 $1,567 Implemented
SF0374 # 16 Y:2009 16 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,002 $318 Implemented
SF0374 # 17 Y:2009 17 2009 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $89,029 $326,072 Implemented
SF0374 # 18 Y:2009 18 2009 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $16,622 $86,476 Implemented
SF0319 # 03 Y:2006 03 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $18,204 $20,250 Implemented
SF0319 # 04 Y:2006 04 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,411 $23,058 Implemented
SF0319 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,934 $18,325 Implemented
SF0319 # 06 Y:2006 06 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,552 $4,648 Implemented
SF0318 # 01 Y:2005 01 2005 USE PHOTOCELL CONTROLS $5,334 $5,796 Implemented
SF0318 # 04 Y:2005 04 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3 $8,530 Implemented
SF0318 # 07 Y:2005 07 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $818 $3,200 Implemented
SF0318 # 08 Y:2005 08 2005 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $13 $10,000 Implemented
MI0113 # 01 Y:2005 01 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $21,712 $52,535 Implemented
MI0113 # 02 Y:2005 02 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,230 $435 Implemented
MI0113 # 04 Y:2005 04 2005 IMPROVE COMBUSTION CONTROL CAPABILITY $5,163 $17,100 Implemented
OK0713 # 04 Y:2005 04 2005 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $48,000 $35 Implemented
OK0713 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $26,495 $85,051 Implemented
OK0713 # 01 Y:2005 01 2005 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $81,171 $1,436 Implemented