Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
664
matching recommendationsSIC | 2037 | Frozen Fruits And Vegetables |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0330 # 05 Y:2003 | 05 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,233 | $220 | Implemented |
IA0330 # 06 Y:2003 | 06 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,040 | $99 | Implemented |
IA0330 # 07 Y:2003 | 07 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,173 | $7,342 | Implemented |
IA0330 # 08 Y:2003 | 08 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $866 | $1,149 | Implemented |
IA0330 # 09 Y:2003 | 09 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,303 | $0 | Implemented |
IA0330 # 10 Y:2003 | 10 | 2003 | INSTALL OCCUPANCY SENSORS | $684 | $1,064 | Implemented |
OR0440 # 01 Y:2003 | 01 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $1,842,800 | $348,000 | Implemented |
OR0440 # 02 Y:2003 | 02 | 2003 | MOVE PRODUCT USING MECHANICAL MEANS | $15,000 | $75 | Not Implemented |
OR0440 # 03 Y:2003 | 03 | 2003 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $16,500 | $5,130 | Implemented |
OR0440 # 04 Y:2003 | 04 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,500 | $0 | Not Implemented |
OR0440 # 05 Y:2003 | 05 | 2003 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $2,600 | $700 | Implemented |
OR0440 # 06 Y:2003 | 06 | 2003 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $765 | $1,300 | Not Implemented |
OR0440 # 07 Y:2003 | 07 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $15,500 | $38,200 | Implemented |
WV0278 # 01 Y:2003 | 01 | 2003 | RECOVER AND REUSE WASTE MATERIAL | $81,748 | $300,000 | Not Implemented |
WV0278 # 02 Y:2003 | 02 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $27,508 | $204 | Implemented |
WV0278 # 03 Y:2003 | 03 | 2003 | REPAIR OR REPLACE STEAM TRAPS | $23,200 | $1,000 | Implemented |
WV0278 # 04 Y:2003 | 04 | 2003 | MINIMIZE WATER USAGE | $21,233 | $3,420 | Not Implemented |
WV0278 # 05 Y:2003 | 05 | 2003 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $18,480 | $504 | Implemented |
WV0278 # 06 Y:2003 | 06 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $15,072 | $1,915 | Not Implemented |
WV0278 # 07 Y:2003 | 07 | 2003 | REDUCE EXCESS STEAM BLEEDING | $9,439 | $37,100 | Not Implemented |
WV0278 # 08 Y:2003 | 08 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,418 | $42 | Implemented |
WV0278 # 09 Y:2003 | 09 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,387 | $7,590 | Implemented |
WV0278 # 10 Y:2003 | 10 | 2003 | INSULATE BARE EQUIPMENT | $3,709 | $258 | Implemented |
WV0278 # 11 Y:2003 | 11 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,990 | $0 | Implemented |
WV0278 # 12 Y:2003 | 12 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $674 | $242 | Not Implemented |