Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
664
matching recommendationsSIC | 2037 | Frozen Fruits And Vegetables |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0278 # 13 Y:2003 | 13 | 2003 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $335 | $1,960 | Not Implemented |
SD0316 # 01 Y:2003 | 01 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,055 | $3,750 | Not Implemented |
SD0316 # 02 Y:2003 | 02 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,922 | $0 | Implemented |
SD0316 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,991 | $300 | Implemented |
SD0316 # 04 Y:2003 | 04 | 2003 | INSTALL SKYLIGHTS | $872 | $1,000 | Not Implemented |
SD0316 # 05 Y:2003 | 05 | 2003 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $47,600 | $40,000 | Not Implemented |
SD0316 # 06 Y:2003 | 06 | 2003 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $11,188 | $10,000 | Not Implemented |
SD0316 # 07 Y:2003 | 07 | 2003 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $2,955 | $9,800 | Not Implemented |
LM0050 # 01 Y:2003 | 01 | 2003 | INSTALL SPECTRAL REFLECTORS / DELAMP | $16,417 | $270 | Not Implemented |
LM0050 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $606 | $900 | Not Implemented |
LM0050 # 03 Y:2003 | 03 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,032 | $342 | Not Implemented |
LM0050 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,993 | $350 | Implemented |
LM0050 # 05 Y:2003 | 05 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,400 | $280 | Not Implemented |
LM0050 # 06 Y:2003 | 06 | 2003 | KEEP BOILER TUBES CLEAN | $552 | $1,000 | Implemented |
LM0050 # 07 Y:2003 | 07 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,896 | $2,669 | Implemented |
LM0050 # 08 Y:2003 | 08 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $937 | $2,580 | Not Implemented |
LM0050 # 09 Y:2003 | 09 | 2003 | DEVELOP STANDARD OPERATING PROCEDURES | $19,825 | $6,026 | Implemented |
LM0050 # 10 Y:2003 | 10 | 2003 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $5,943 | $1,000 | Implemented |
LM0050 # 11 Y:2003 | 11 | 2003 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $57,825 | $12,920 | Not Implemented |
LM0050 # 12 Y:2003 | 12 | 2003 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $25,000 | $15,404 | Not Implemented |
LM0050 # 13 Y:2003 | 13 | 2003 | INSTALL AUTOMATIC PACKING EQUIPMENT | $62,400 | $100,000 | Not Implemented |
LM0050 # 14 Y:2003 | 14 | 2003 | USE ONLY AMOUNT OF PACKAGING MATERIAL NECESSARY | $101,616 | $150,000 | Not Implemented |
OR0422 # 01 Y:2002 | 01 | 2002 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,067 | $0 | Implemented |
OR0422 # 02 Y:2002 | 02 | 2002 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $4,106 | $2,000 | Implemented |
OR0422 # 03 Y:2002 | 03 | 2002 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $6,975 | $5,500 | Implemented |