IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

664

matching recommendations
Reset
SIC 2037 Frozen Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0271 # 02 Y:1996 02 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $22,000 $5,000 Implemented
OR0271 # 03 Y:1996 03 1996 REPLACE STEAM JETS ON VACUUM SYSTEM WITH ELECTRIC MOTOR DRIVEN VACUUM PUMPS $10,070 $6,000 Not Implemented
OR0271 # 04 Y:1996 04 1996 KEEP BOILER TUBES CLEAN $330 $500 Not Implemented
OR0271 # 05 Y:1996 05 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,740 $16,120 Implemented
OR0271 # 06 Y:1996 06 1996 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $160 $0 Not Implemented
OR0271 # 07 Y:1996 07 1996 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $5,480 $3,000 Implemented
UF0145 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,729 $8,827 Not Implemented
UF0145 # 02 Y:1996 02 1996 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $1,843 $2,500 Implemented
UF0145 # 03 Y:1996 03 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,532 $3,500 Implemented
UF0145 # 04 Y:1996 04 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $39,624 $18,550 Not Implemented
UF0145 # 05 Y:1996 05 1996 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,868 $3,575 Implemented
UF0145 # 06 Y:1996 06 1996 TREAT AND REUSE RINSE WATERS $11,487 $40,000 Implemented
KG0027 # 01 Y:1995 01 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,341 $4,000 Implemented
KG0027 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,037 $6,665 Implemented
KG0027 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,917 $15,175 Implemented
KG0027 # 04 Y:1995 04 1995 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,749 $900 Not Implemented
CO0333 # 01 Y:1995 01 1995 RECOVER WASTE HEAT FROM EQUIPMENT $4,670 $16,140 Not Implemented
CO0333 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,340 $4,890 Not Implemented
CO0333 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,370 $5,280 Not Implemented
CO0333 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,640 $9,910 Not Implemented
CO0333 # 05 Y:1995 05 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $440 $1,880 Not Implemented
ME0158 # 01 Y:1995 01 1995 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $22,418 $0 Implemented
ME0158 # 02 Y:1995 02 1995 USE POWER DURING OFF-PEAK PERIODS $9,670 $0 Implemented
ME0158 # 03 Y:1995 03 1995 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,400 $0 Implemented
ME0158 # 04 Y:1995 04 1995 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,257 $400 Not Implemented