IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

664

matching recommendations
Reset
SIC 2037 Frozen Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0327 # 08 Y:2018 08 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,910 $40 Not Implemented
MI0327 # 09 Y:2018 09 2018 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $268 $40 Not Implemented
SF0513 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $6,923 $0 Not Implemented
SF0513 # 02 Y:2018 02 2018 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $177,909 $41,250 Implemented
SF0513 # 03 Y:2018 03 2018 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $66,148 $67,793 Implemented
SF0513 # 04 Y:2018 04 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,395 $10,091 Not Implemented
SF0513 # 05 Y:2018 05 2018 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $64,975 $191,474 Implemented
OR0694 # 01 Y:2017 01 2017 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $190,250 $7,842 Not Implemented
OR0694 # 02 Y:2017 02 2017 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $78,503 $7,018 Not Implemented
OR0694 # 03 Y:2017 03 2017 INSTALL BACK-UP EQUIPMENT $219,130 $45,000 Not Implemented
OR0694 # 04 Y:2017 04 2017 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $29,962 $12,100 Not Implemented
OR0694 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,605 $10,606 Not Implemented
OR0694 # 06 Y:2017 06 2017 MINIMIZE WATER USAGE $8,079 $15,125 Not Implemented
BS0049 # 02 Y:2015 02 2015 AVOID FROST FORMATION ON EVAPORATORS $102,865 $70,430 Not Implemented
BS0049 # 01 Y:2015 01 2015 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $394,723 $180,080 Not Implemented
BS0049 # 09 Y:2015 09 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,061 $624 Not Implemented
BS0049 # 08 Y:2015 08 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,284 $7,380 Not Implemented
BS0049 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $6,168 $801 Not Implemented
BS0049 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,745 $19,475 Not Implemented
BS0049 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,049 $65,491 Not Implemented
BS0049 # 04 Y:2015 04 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $41,557 $1,388 Not Implemented
BS0049 # 03 Y:2015 03 2015 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $63,716 $137,445 Not Implemented
MI0263 # 13 Y:2014 13 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $409 $173 Implemented
MI0263 # 12 Y:2014 12 2014 INSULATE BARE EQUIPMENT $708 $280 Not Implemented
MI0263 # 11 Y:2014 11 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,317 $80 Implemented