IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

652

matching recommendations
Reset
SIC 2037 Frozen Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0694 # 06 Y:2017 06 2017 MINIMIZE WATER USAGE $8,079 $15,125 Not Implemented
BS0049 # 02 Y:2015 02 2015 AVOID FROST FORMATION ON EVAPORATORS $102,865 $70,430 Not Implemented
BS0049 # 03 Y:2015 03 2015 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $63,716 $137,445 Not Implemented
BS0049 # 04 Y:2015 04 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $41,557 $1,388 Not Implemented
BS0049 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,049 $65,491 Not Implemented
BS0049 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,745 $19,475 Not Implemented
BS0049 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $6,168 $801 Not Implemented
BS0049 # 08 Y:2015 08 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,284 $7,380 Not Implemented
BS0049 # 09 Y:2015 09 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,061 $624 Not Implemented
BS0049 # 01 Y:2015 01 2015 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $394,723 $180,080 Not Implemented
MI0263 # 13 Y:2014 13 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $409 $173 Implemented
MI0263 # 12 Y:2014 12 2014 INSULATE BARE EQUIPMENT $708 $280 Not Implemented
MI0263 # 11 Y:2014 11 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,317 $80 Implemented
MI0263 # 10 Y:2014 10 2014 USE OPTIMUM THICKNESS INSULATION $1,375 $360 Implemented
MI0263 # 09 Y:2014 09 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,472 $1,660 Implemented
MI0263 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $1,643 $497 Implemented
MI0263 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,377 $10,770 Not Implemented
MI0263 # 06 Y:2014 06 2014 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,052 $560 Implemented
MI0263 # 05 Y:2014 05 2014 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,131 $4,980 Not Implemented
MI0263 # 04 Y:2014 04 2014 HEAT WATER WITH EXHAUST HEAT $6,564 $8,859 Not Implemented
MI0263 # 03 Y:2014 03 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,762 $28,000 Not Implemented
MI0263 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $11,051 $500 Implemented
MI0263 # 01 Y:2014 01 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $23,147 $3,600 Not Implemented
OR0626 # 01 Y:2014 01 2014 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $18,202 $6,792 Not Implemented
OR0626 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,945 $1,000 Not Implemented