Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsSIC | 2037 | Frozen Fruits And Vegetables |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0040 # 07 Y:1992 | 07 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $530 | $50 | Implemented |
IA0040 # 06 Y:1992 | 06 | 1992 | INSTALL SET-BACK TIMERS | $890 | $1,701 | Not Implemented |
IA0040 # 05 Y:1992 | 05 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,718 | $2,220 | Implemented |
IA0040 # 04 Y:1992 | 04 | 1992 | INSULATE BARE EQUIPMENT | $1,722 | $4,219 | Not Implemented |
IA0040 # 03 Y:1992 | 03 | 1992 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $5,208 | $650 | Not Implemented |
IA0040 # 02 Y:1992 | 02 | 1992 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,369 | $18,000 | Not Implemented |
IA0040 # 01 Y:1992 | 01 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $25,896 | $1,200 | Not Implemented |
IA0022 # 02 Y:1992 | 02 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $757 | $14 | Implemented |
IA0023 # 08 Y:1992 | 08 | 1992 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $211,326 | $1 | n/a |
IA0023 # 07 Y:1992 | 07 | 1992 | OPTIMIZE PLANT POWER FACTOR | $94,150 | $84,875 | n/a |
IA0023 # 06 Y:1992 | 06 | 1992 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,709 | $8,000 | n/a |
IA0023 # 04 Y:1992 | 04 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,986 | $8,825 | n/a |
IA0023 # 05 Y:1992 | 05 | 1992 | INSTALL SET-BACK TIMERS | $1,114 | $1,188 | n/a |
IA0022 # 01 Y:1992 | 01 | 1992 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $39,467 | $20,000 | Not Implemented |
IA0022 # 03 Y:1992 | 03 | 1992 | INSTALL SET-BACK TIMERS | $3,166 | $2,907 | Not Implemented |
IA0022 # 04 Y:1992 | 04 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $774 | $134 | Implemented |
IA0022 # 05 Y:1992 | 05 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,737 | $1,196 | Implemented |
IA0022 # 06 Y:1992 | 06 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $538 | $229 | Implemented |
IA0022 # 07 Y:1992 | 07 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,988 | $100 | Not Implemented |
IA0023 # 01 Y:1992 | 01 | 1992 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $136,664 | $13,000 | n/a |
IA0023 # 02 Y:1992 | 02 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,994 | $16 | n/a |
IA0023 # 03 Y:1992 | 03 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,957 | $1,480 | n/a |
OR0144 # 12 Y:1992 | 12 | 1992 | INSULATE FEEDWATER TANK | $504 | $272 | Implemented |
OR0144 # 11 Y:1992 | 11 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,293 | $500 | Implemented |
OR0144 # 10 Y:1992 | 10 | 1992 | OPTIMIZE PLANT POWER FACTOR | $6,939 | $16,250 | Not Implemented |