IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

422

matching recommendations
Reset
SIC 2038 Frozen Specialties, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0179 # 06 Y:2017 06 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,934 $6,152 Not Implemented
UA0179 # 07 Y:2017 07 2017 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,673 $7,500 Not Implemented
UA0179 # 08 Y:2017 08 2017 INSULATE BARE EQUIPMENT $429 $247 Implemented
UA0179 # 09 Y:2017 09 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,242 $1,015 Implemented
MZ0215 # 04 Y:2016 04 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $567 $0 Not Implemented
MZ0215 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $1,093 $220 Implemented
MZ0215 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $2,514 $1,500 Implemented
MZ0215 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,397 $8,400 Implemented
NC0518 # 13 Y:2014 13 2014 INSTALL OCCUPANCY SENSORS $437 $774 Implemented
NC0518 # 12 Y:2014 12 2014 USE PHOTOCELL CONTROLS $103 $80 Implemented
NC0518 # 11 Y:2014 11 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $536 $160 Implemented
NC0518 # 10 Y:2014 10 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,688 $3,708 Implemented
NC0518 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,951 $7,604 Implemented
NC0518 # 08 Y:2014 08 2014 DEVELOP A REPAIR/REPLACE POLICY $2,258 $4,256 Implemented
NC0518 # 07 Y:2014 07 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $524 $100 Implemented
NC0518 # 06 Y:2014 06 2014 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $7,321 $15,000 Not Implemented
NC0518 # 05 Y:2014 05 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,126 $5,000 Not Implemented
NC0518 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,276 $100 Implemented
NC0518 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $824 $1,750 Not Implemented
NC0518 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,224 $50 Implemented
NC0518 # 01 Y:2014 01 2014 INSTALL AUTOMATIC PACKING EQUIPMENT $1,248,000 $800,000 Implemented
DL0127 # 01 Y:2014 01 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,800 $100 Implemented
DL0127 # 02 Y:2014 02 2014 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,800 $2,100 Not Implemented
DL0127 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,300 $100 Not Implemented
DL0127 # 04 Y:2014 04 2014 REPLACE STEAM JETS ON VACUUM SYSTEM WITH ELECTRIC MOTOR DRIVEN VACUUM PUMPS $1,200 $1,800 Not Implemented