IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

61

matching recommendations
Reset
SIC 204 Grain Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0284 # 11 Y:1996 11 1996 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $948 $0 Implemented
WI0284 # 10 Y:1996 10 1996 RECOVER WASTE HEAT FROM EQUIPMENT $1,061 $1,000 Implemented
WI0284 # 08 Y:1996 08 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $834 $1,771 Implemented
WI0284 # 07 Y:1996 07 1996 INSTALL OCCUPANCY SENSORS $1,864 $975 Implemented
WI0284 # 06 Y:1996 06 1996 MINIMIZE WATER USAGE $2,210 $1,000 Implemented
WI0284 # 04 Y:1996 04 1996 SELL / OFFER BY-PRODUCT AS ANIMAL FEED $7,341 $2,500 Implemented
WI0284 # 03 Y:1996 03 1996 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $11,172 $500 Implemented
WI0284 # 02 Y:1996 02 1996 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,988 $14,280 Implemented
OK0505 # 03 Y:1996 03 1996 USE MINIMUM STEAM OPERATING PRESSURE $443 $0 Implemented
OK0505 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $750 $1,182 Implemented
OK0505 # 06 Y:1996 06 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,644 $150 Implemented
OK0507 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,744 $390 Implemented
OK0507 # 05 Y:1996 05 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,538 $7,860 Implemented
AS0186 # 01 Y:1996 01 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,586 $16,140 Implemented
AS0186 # 04 Y:1996 04 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,738 $0 Implemented
AS0186 # 08 Y:1996 08 1996 CONTRACT A WOOD PALLET RECYCLING COMPANY $465 $0 Implemented
AS0186 # 07 Y:1996 07 1996 METER WASTE WATER $8,798 $5,000 Implemented
AS0186 # 02 Y:1996 02 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,274 $5,945 Implemented
AS0186 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,734 $7,000 Implemented
AS0186 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,675 $2,086 Implemented
AS0186 # 06 Y:1996 06 1996 INSTALL OCCUPANCY SENSORS $712 $525 Implemented
OK0506 # 02 Y:1996 02 1996 INSTALL TIMERS AND/OR THERMOSTATS $104 $126 Implemented
OK0506 # 03 Y:1996 03 1996 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $705 $100 Implemented
OK0506 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $172 $60 Implemented
OK0506 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $820 $2,304 Implemented