Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,084

matching recommendations
Reset
SIC 204 Grain Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0253 # 03 Y:2007 03 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $22,542 $300 Implemented
LE0253 # 04 Y:2007 04 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $20,904 $300 Implemented
LE0253 # 05 Y:2007 05 2007 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $20,819 $37,000 Implemented
LE0253 # 06 Y:2007 06 2007 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $12,436 $15,000 Not Implemented
LE0253 # 07 Y:2007 07 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,186 $1,000 Implemented
LE0253 # 08 Y:2007 08 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,349 $6,200 Implemented
LE0253 # 09 Y:2007 09 2007 INSTALL TIMERS AND/OR THERMOSTATS $8,342 $480 Not Implemented
LE0253 # 10 Y:2007 10 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,672 $2,500 Not Implemented
LE0253 # 11 Y:2007 11 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $1,980 $510 Not Implemented
LE0253 # 12 Y:2007 12 2007 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $60,000 $100,000 Not Implemented
UM0312 # 01 Y:2006 01 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $15,410 $500 Not Implemented
UM0312 # 02 Y:2006 02 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $14,289 $4,200 Not Implemented
UM0312 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,355 $15,984 Not Implemented
UM0312 # 04 Y:2006 04 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $6,421 $100 Not Implemented
UM0312 # 05 Y:2006 05 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,885 $2,250 Implemented
UM0312 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,862 $200 Not Implemented
UM0312 # 07 Y:2006 07 2006 RECOVER WASTE HEAT FROM EQUIPMENT $1,826 $1,300 Not Implemented
UM0312 # 08 Y:2006 08 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,622 $800 Not Implemented
UM0312 # 09 Y:2006 09 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $857 $300 Not Implemented
UM0312 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $508 $276 Not Implemented
CO0589 # 01 Y:2006 01 2006 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $264,540 $1,173,000 Not Implemented
CO0589 # 02 Y:2006 02 2006 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $56,580 $570 Implemented
CO0589 # 03 Y:2006 03 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $950 $500 Implemented
CO0589 # 04 Y:2006 04 2006 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $23,960 $0 Implemented
CO0589 # 05 Y:2006 05 2006 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $21,540 $100,800 Not Implemented