IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,095

matching recommendations
Reset
SIC 204 Grain Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0046 # 01 Y:2003 01 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,936 $5,500 Not Implemented
UU0046 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $50,075 $0 Not Implemented
UU0046 # 03 Y:2003 03 2003 OPTIMIZE PLANT POWER FACTOR $12,187 $14,400 Not Implemented
UU0046 # 04 Y:2003 04 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,186 $9,000 Not Implemented
UU0046 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $6,168 $750 Not Implemented
UU0046 # 06 Y:2003 06 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,686 $7,815 Implemented
UU0046 # 07 Y:2003 07 2003 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $5,727 $3,889 Not Implemented
OR0428 # 01 Y:2003 01 2003 COMBINE UTILITY METERS $3,901 $7,500 Not Implemented
OR0428 # 02 Y:2003 02 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $307 $0 Implemented
OR0428 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $743 $26 Implemented
OR0428 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $437 $500 Implemented
OR0428 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $742 $1,320 Not Implemented
OR0428 # 06 Y:2003 06 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $688 $2,800 Not Implemented
OR0428 # 07 Y:2003 07 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $400 $1,970 Implemented
OK0646 # 01 Y:2002 01 2002 OPTIMIZE PLANT POWER FACTOR $1,976 $3,150 Not Implemented
OK0646 # 02 Y:2002 02 2002 INSTALL SET-BACK TIMERS $469 $93 Implemented
OK0646 # 03 Y:2002 03 2002 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $659 $0 Implemented
OK0646 # 04 Y:2002 04 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $13,960 $0 Implemented
OK0646 # 05 Y:2002 05 2002 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $113 $60 Not Implemented
OK0646 # 06 Y:2002 06 2002 UPGRADE CONTROLS ON COMPRESSORS $1,858 $150 Not Implemented
OK0646 # 07 Y:2002 07 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $3,545 $5,270 Implemented
OK0646 # 08 Y:2002 08 2002 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $8,334 $9,000 Not Implemented
UD0655 # 01 Y:2002 01 2002 DEVELOP STANDARD OPERATING PROCEDURES $147,420 $0 Implemented
UD0655 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,350 $1,122 Implemented
UD0655 # 03 Y:2002 03 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,888 $0 Not Implemented