IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,070

matching recommendations
Reset
SIC 204 Grain Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0159 # 08 Y:2020 08 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $780 $1,585 Not Implemented
WM0159 # 09 Y:2020 09 2020 UPGRADE CONTROLS ON COMPRESSORS $589 $1,748 Implemented
OK1021 # 01 Y:2019 01 2019 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $957 $524 Implemented
OK1021 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,490 $4,312 Implemented
OK1021 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,570 $850 Implemented
OK1021 # 04 Y:2019 04 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $6,865 $426 Implemented
OK1021 # 05 Y:2019 05 2019 INSTALL SUB-METERING EQUIPMENT $5,665 $887 Not Implemented
IC0220 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $75,268 $7,000 Implemented
IC0220 # 02 Y:2019 02 2019 MAINTAIN MACHINES TO REDUCE LEAKS $8,888 $5,750 Not Implemented
IC0220 # 03 Y:2019 03 2019 REPAIR OR REPLACE STEAM TRAPS $17,321 $4,875 Implemented
IC0220 # 04 Y:2019 04 2019 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $37,319 $5,747 Not Implemented
IC0220 # 05 Y:2019 05 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $274 $250 Not Implemented
IC0220 # 06 Y:2019 06 2019 MINIMIZE WATER USAGE $9,210 $11,980 Implemented
BS0124 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,766 $6,213 Not Implemented
BS0124 # 02 Y:2019 02 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $392 $1,259 Not Implemented
BS0124 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,609 $1,030 Not Implemented
BS0124 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,460 $2,200 Not Implemented
UU0137 # 01 Y:2018 01 2018 RECOVER WASTE HEAT FROM EQUIPMENT $48,448 $23,000 Not Implemented
UU0137 # 02 Y:2018 02 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,021 $24,600 Implemented
UU0137 # 03 Y:2018 03 2018 RECOVER WASTE HEAT FROM EQUIPMENT $26,521 $17,000 Implemented
UU0137 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $11,622 $7,600 Implemented
UU0137 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,310 $7,650 Implemented
UU0137 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $973 $3,500 Implemented
NL0021 # 01 Y:2018 01 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,355 $0 Implemented
NL0021 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,774 $15,206 Implemented