Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
80
matching recommendationsSIC | 204 | Grain Mill Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0417 # 02 Y:2022 | 02 | 2022 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $25,845 | $0 | Implemented |
MI0417 # 01 Y:2022 | 01 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $58,143 | $16,338 | Not Implemented |
MI0417 # 08 Y:2022 | 08 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,839 | $2,140 | Implemented |
MI0417 # 07 Y:2022 | 07 | 2022 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,772 | $2,740 | Not Implemented |
MI0417 # 06 Y:2022 | 06 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,907 | $580 | Not Implemented |
MI0417 # 04 Y:2022 | 04 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,521 | $4,259 | Not Implemented |
MI0417 # 03 Y:2022 | 03 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,705 | $18,960 | Not Implemented |
MI0417 # 05 Y:2022 | 05 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $9,078 | $12,846 | Not Implemented |
UF0560 # 02 Y:2020 | 02 | 2020 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $4,454 | $5,998 | Implemented |
UF0560 # 01 Y:2020 | 01 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $41,999 | $359,360 | Not Implemented |
UF0560 # 04 Y:2020 | 04 | 2020 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,897 | $1,544 | Implemented |
UF0560 # 05 Y:2020 | 05 | 2020 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $1,841 | $378 | Implemented |
UF0560 # 08 Y:2020 | 08 | 2020 | MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS | $9,639 | $725 | Implemented |
UF0560 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,156 | $306 | Implemented |
UF0560 # 03 Y:2020 | 03 | 2020 | INSTALL OCCUPANCY SENSORS | $3,072 | $8,274 | Not Implemented |
UF0560 # 07 Y:2020 | 07 | 2020 | LEVEL THREE - INSTALL OR MODIFY CONTROL SYSTEM WITH COMMUNICATION AND NONLOCAL EXTERNAL INFORMATION (I.E. WEATHER FORECA | $134,615 | $11,004 | Not Implemented |
UF0507 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,676 | $1,124 | Implemented |
UF0507 # 03 Y:2017 | 03 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,363 | $210 | Implemented |
UF0507 # 02 Y:2017 | 02 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,643 | $3,762 | Implemented |
UF0507 # 05 Y:2017 | 05 | 2017 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $14,679 | $43,710 | Not Implemented |
UF0507 # 04 Y:2017 | 04 | 2017 | INCREASE AMOUNT OF CONDENSATE RETURNED | $814 | $876 | Implemented |
UF0507 # 06 Y:2017 | 06 | 2017 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $3,808 | $0 | Implemented |
UF0433 # 07 Y:2010 | 07 | 2010 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $11,610 | $0 | Implemented |
UF0433 # 08 Y:2010 | 08 | 2010 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,722 | $6,350 | Not Implemented |
UF0433 # 03 Y:2010 | 03 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,138 | $8,558 | Not Implemented |