IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

80

matching recommendations
Reset
SIC 204 Grain Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0417 # 02 Y:2022 02 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $25,845 $0 Implemented
MI0417 # 01 Y:2022 01 2022 UPGRADE CONTROLS ON COMPRESSORS $58,143 $16,338 Not Implemented
MI0417 # 08 Y:2022 08 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,839 $2,140 Implemented
MI0417 # 07 Y:2022 07 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,772 $2,740 Not Implemented
MI0417 # 06 Y:2022 06 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,907 $580 Not Implemented
MI0417 # 04 Y:2022 04 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,521 $4,259 Not Implemented
MI0417 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,705 $18,960 Not Implemented
MI0417 # 05 Y:2022 05 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $9,078 $12,846 Not Implemented
UF0560 # 02 Y:2020 02 2020 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $4,454 $5,998 Implemented
UF0560 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $41,999 $359,360 Not Implemented
UF0560 # 04 Y:2020 04 2020 INSTALL / REPAIR INSULATION ON STEAM LINES $2,897 $1,544 Implemented
UF0560 # 05 Y:2020 05 2020 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,841 $378 Implemented
UF0560 # 08 Y:2020 08 2020 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $9,639 $725 Implemented
UF0560 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,156 $306 Implemented
UF0560 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $3,072 $8,274 Not Implemented
UF0560 # 07 Y:2020 07 2020 LEVEL THREE - INSTALL OR MODIFY CONTROL SYSTEM WITH COMMUNICATION AND NONLOCAL EXTERNAL INFORMATION (I.E. WEATHER FORECA $134,615 $11,004 Not Implemented
UF0507 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,676 $1,124 Implemented
UF0507 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,363 $210 Implemented
UF0507 # 02 Y:2017 02 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $2,643 $3,762 Implemented
UF0507 # 05 Y:2017 05 2017 INSTALL AN UNINTERUPTABLE POWER SUPPLY $14,679 $43,710 Not Implemented
UF0507 # 04 Y:2017 04 2017 INCREASE AMOUNT OF CONDENSATE RETURNED $814 $876 Implemented
UF0507 # 06 Y:2017 06 2017 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $3,808 $0 Implemented
UF0433 # 07 Y:2010 07 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,610 $0 Implemented
UF0433 # 08 Y:2010 08 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,722 $6,350 Not Implemented
UF0433 # 03 Y:2010 03 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,138 $8,558 Not Implemented