Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
96
matching recommendationsSIC | 204 | Grain Mill Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0370 # 04 Y:2025 | 04 | 2025 | INSTALL OCCUPANCY SENSORS | $6,915 | $4,560 | n/a |
MZ0370 # 07 Y:2025 | 07 | 2025 | INSULATE BARE EQUIPMENT | $883 | $418 | n/a |
MZ0370 # 05 Y:2025 | 05 | 2025 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,132 | $200 | n/a |
MZ0370 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,031 | $3,941 | n/a |
MZ0370 # 06 Y:2025 | 06 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,914 | $12,624 | n/a |
MZ0370 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,634 | $22,593 | n/a |
MZ0370 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,013 | $1,000 | n/a |
MZ0338 # 06 Y:2023 | 06 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,195 | $240 | Not Implemented |
MZ0338 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,644 | $13,800 | Implemented |
MZ0338 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $60,112 | $127,747 | Implemented |
MZ0338 # 03 Y:2023 | 03 | 2023 | INSTALL OCCUPANCY SENSORS | $2,124 | $3,920 | Implemented |
MZ0338 # 02 Y:2023 | 02 | 2023 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,823 | $860 | Implemented |
MZ0338 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $576,991 | $4,487,250 | Not Implemented |
MZ0185 # 06 Y:2015 | 06 | 2015 | USE PHOTOCELL CONTROLS | $30,214 | $15,000 | Implemented |
MZ0185 # 05 Y:2015 | 05 | 2015 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $92,880 | $450,000 | Not Implemented |
MZ0185 # 01 Y:2015 | 01 | 2015 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $444,193 | $2,686,745 | Not Implemented |
MZ0185 # 03 Y:2015 | 03 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $16,223 | $0 | Not Implemented |
MZ0185 # 02 Y:2015 | 02 | 2015 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $4,593 | $7,228 | Implemented |
MZ0185 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,296 | $9,730 | Implemented |
MZ0176 # 02 Y:2015 | 02 | 2015 | UPGRADE CONTROLS ON COMPRESSORS | $22,758 | $100,000 | Not Implemented |
MZ0176 # 08 Y:2015 | 08 | 2015 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $2,330 | $3,500 | Not Implemented |
MZ0176 # 03 Y:2015 | 03 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $16,004 | $6,500 | Not Implemented |
MZ0176 # 01 Y:2015 | 01 | 2015 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $8,279 | $0 | Not Implemented |
MZ0176 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,037 | $1,560 | Not Implemented |
MZ0176 # 04 Y:2015 | 04 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,923 | $1,000 | Not Implemented |