IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

40

matching recommendations
Reset
SIC 204 Grain Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0618 # 05 Y:2013 05 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,187 $2,283 Not Implemented
OR0618 # 04 Y:2013 04 2013 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $9,796 $50,179 Not Implemented
OR0618 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $977 $1,975 Not Implemented
OR0618 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,881 $3,300 Not Implemented
OR0618 # 02 Y:2013 02 2013 MODIFY STARTUP/SHUTDOWN TIMES $10,380 $800 Not Implemented
OR0428 # 01 Y:2003 01 2003 COMBINE UTILITY METERS $3,901 $7,500 Not Implemented
OR0428 # 02 Y:2003 02 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $307 $0 Implemented
OR0428 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $743 $26 Implemented
OR0428 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $437 $500 Implemented
OR0428 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $742 $1,320 Not Implemented
OR0428 # 06 Y:2003 06 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $688 $2,800 Not Implemented
OR0428 # 07 Y:2003 07 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $400 $1,970 Implemented
OR0372 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,908 $53,354 Implemented
OR0372 # 04 Y:2000 04 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,930 $0 Not Implemented
OR0372 # 03 Y:2000 03 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $15,940 $58,950 Not Implemented
OR0372 # 01 Y:2000 01 2000 OPTIMIZE PLANT POWER FACTOR $7,914 $22,000 Implemented
OR0297 # 01 Y:1997 01 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $3,530 $0 Not Implemented
OR0297 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,121 $3,853 Not Implemented
OR0297 # 03 Y:1997 03 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,160 $500 Not Implemented
OR0297 # 04 Y:1997 04 1997 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $171 $0 Not Implemented
OR0297 # 05 Y:1997 05 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,706 $8,250 Not Implemented
OR0297 # 06 Y:1997 06 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,420 $130 Not Implemented
OR0115 # 05 Y:1991 05 1991 OPTIMIZE PLANT POWER FACTOR $506 $2,700 Not Implemented
OR0115 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,297 $0 Not Implemented
OR0115 # 02 Y:1991 02 1991 INCREASE AMOUNT OF CONDENSATE RETURNED $142 $175 Not Implemented