Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

67

matching recommendations
Reset
SIC 204 Grain Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0587 # 08 Y:1999 08 1999 INSULATE BARE EQUIPMENT $250 $525 n/a
OK0587 # 07 Y:1999 07 1999 INSULATE BARE EQUIPMENT $252 $1,028 n/a
OK0587 # 01 Y:1999 01 1999 INSTALL SYSTEM TO COLLECT SCRAP $20,078 $2,250 n/a
OK0587 # 02 Y:1999 02 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,905 $0 n/a
OK0587 # 03 Y:1999 03 1999 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $7,398 $31,705 n/a
OK0587 # 04 Y:1999 04 1999 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $3,795 $0 n/a
OK0587 # 05 Y:1999 05 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,193 $3,150 n/a
OK0587 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $891 $24 n/a
CO0451 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $190 $320 Implemented
CO0451 # 05 Y:1999 05 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $20 $0 Not Implemented
CO0451 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $220 $20 Implemented
CO0451 # 01 Y:1999 01 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $7,190 $6,250 Not Implemented
CO0451 # 02 Y:1999 02 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,080 $4,000 Implemented
ME0273 # 06 Y:1999 06 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $23,318 $212,393 n/a
ME0273 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $309 $100 n/a
ME0273 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,815 $5,192 n/a
ME0273 # 07 Y:1999 07 1999 REDUCE SCRAP PRODUCTION $13,050 $22,253 n/a
ME0273 # 08 Y:1999 08 1999 ELIMINATE/REDUCE AN OPERATION $1,716 $612 n/a
ME0273 # 03 Y:1999 03 1999 USE SOLAR HEAT FOR HEAT $1,220 $5,472 n/a
ME0273 # 04 Y:1999 04 1999 PAY BILLS ON TIME TO AVOID LATE FEES $421 $0 n/a
ME0273 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,750 $4,260 n/a
ND0324 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $459 $1,800 Not Implemented
ND0324 # 04 Y:1999 04 1999 DEVELOP A REPAIR/REPLACE POLICY $52,604 $41,503 Not Implemented
ND0324 # 03 Y:1999 03 1999 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $7,258 $30,000 Implemented
ND0324 # 02 Y:1999 02 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,051 $250 Implemented