Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
54
matching recommendationsSIC | 204 | Grain Mill Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0607 # 03 Y:2000 | 03 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,130 | $10,700 | Not Implemented |
OK0607 # 02 Y:2000 | 02 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $43,000 | $70,000 | Not Implemented |
OK0607 # 04 Y:2000 | 04 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $14,930 | $30,000 | Not Implemented |
OK0607 # 01 Y:2000 | 01 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,830 | $200 | Implemented |
GT0703 # 07 Y:2000 | 07 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,031 | $0 | Not Implemented |
GT0703 # 06 Y:2000 | 06 | 2000 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,968 | $0 | Not Implemented |
GT0703 # 05 Y:2000 | 05 | 2000 | REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE | $17,878 | $40,000 | Not Implemented |
GT0703 # 04 Y:2000 | 04 | 2000 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $42,350 | $8,000 | Not Implemented |
GT0703 # 03 Y:2000 | 03 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $11,854 | $3,000 | Not Implemented |
GT0703 # 02 Y:2000 | 02 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $14,855 | $30,000 | Implemented |
GT0703 # 01 Y:2000 | 01 | 2000 | INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER | $2,459 | $0 | Not Implemented |
NV0169 # 01 Y:2000 | 01 | 2000 | TURN OFF EQUIPMENT WHEN NOT IN USE | $16,388 | $5,060 | Not Implemented |
NV0169 # 05 Y:2000 | 05 | 2000 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $164,384 | $1,250 | Not Implemented |
NV0169 # 06 Y:2000 | 06 | 2000 | ELIMINATE/REDUCE REDUNDANT INSPECTIONS | $13,013 | $1,000 | Not Implemented |
NV0169 # 02 Y:2000 | 02 | 2000 | INSTALL SKYLIGHTS | $13,086 | $25,700 | Not Implemented |
NV0169 # 03 Y:2000 | 03 | 2000 | INSTALL / REPAIR INSULATION ON STEAM LINES | $865 | $620 | Not Implemented |
NV0169 # 04 Y:2000 | 04 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $308 | $661 | Implemented |
OR0372 # 04 Y:2000 | 04 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,930 | $0 | Not Implemented |
OR0372 # 03 Y:2000 | 03 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $15,940 | $58,950 | Not Implemented |
OR0372 # 02 Y:2000 | 02 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $18,908 | $53,354 | Implemented |
OR0372 # 01 Y:2000 | 01 | 2000 | OPTIMIZE PLANT POWER FACTOR | $7,914 | $22,000 | Implemented |
KU0546 # 01 Y:2000 | 01 | 2000 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $431,791 | $2,400,000 | Not Implemented |
KU0546 # 02 Y:2000 | 02 | 2000 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $74,779 | $244,140 | Not Implemented |
KU0546 # 03 Y:2000 | 03 | 2000 | OPTIMIZE PLANT POWER FACTOR | $17,000 | $9,570 | Not Implemented |
KU0546 # 04 Y:2000 | 04 | 2000 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,500 | $1,000 | Implemented |