IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
SIC 204 Grain Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0607 # 03 Y:2000 03 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,130 $10,700 Not Implemented
OK0607 # 02 Y:2000 02 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $43,000 $70,000 Not Implemented
OK0607 # 04 Y:2000 04 2000 RECOVER WASTE HEAT FROM EQUIPMENT $14,930 $30,000 Not Implemented
OK0607 # 01 Y:2000 01 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,830 $200 Implemented
GT0703 # 07 Y:2000 07 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,031 $0 Not Implemented
GT0703 # 06 Y:2000 06 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,968 $0 Not Implemented
GT0703 # 05 Y:2000 05 2000 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $17,878 $40,000 Not Implemented
GT0703 # 04 Y:2000 04 2000 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $42,350 $8,000 Not Implemented
GT0703 # 03 Y:2000 03 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $11,854 $3,000 Not Implemented
GT0703 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,855 $30,000 Implemented
GT0703 # 01 Y:2000 01 2000 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $2,459 $0 Not Implemented
NV0169 # 01 Y:2000 01 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $16,388 $5,060 Not Implemented
NV0169 # 05 Y:2000 05 2000 INSTALL AN UNINTERUPTABLE POWER SUPPLY $164,384 $1,250 Not Implemented
NV0169 # 06 Y:2000 06 2000 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $13,013 $1,000 Not Implemented
NV0169 # 02 Y:2000 02 2000 INSTALL SKYLIGHTS $13,086 $25,700 Not Implemented
NV0169 # 03 Y:2000 03 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $865 $620 Not Implemented
NV0169 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $308 $661 Implemented
OR0372 # 04 Y:2000 04 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,930 $0 Not Implemented
OR0372 # 03 Y:2000 03 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $15,940 $58,950 Not Implemented
OR0372 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,908 $53,354 Implemented
OR0372 # 01 Y:2000 01 2000 OPTIMIZE PLANT POWER FACTOR $7,914 $22,000 Implemented
KU0546 # 01 Y:2000 01 2000 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $431,791 $2,400,000 Not Implemented
KU0546 # 02 Y:2000 02 2000 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $74,779 $244,140 Not Implemented
KU0546 # 03 Y:2000 03 2000 OPTIMIZE PLANT POWER FACTOR $17,000 $9,570 Not Implemented
KU0546 # 04 Y:2000 04 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,500 $1,000 Implemented