IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 2041 Flour And Other Grain Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0517 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $240 $250 Implemented
KU0517 # 04 Y:1999 04 1999 INSTALL OCCUPANCY SENSORS $1,100 $1,950 Implemented
KU0517 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,430 $350 Implemented
KU0517 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,360 $2,580 Implemented
KU0516 # 08 Y:1999 08 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $49,760 $35,000 Implemented
KU0516 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,220 $870 Implemented
KU0516 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,770 $670 Implemented
KU0516 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,520 $8,930 Implemented
KU0516 # 01 Y:1999 01 1999 OPTIMIZE PLANT POWER FACTOR $17,580 $24,400 Implemented
KU0495 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,680 $390 Implemented
KU0495 # 09 Y:1998 09 1998 METER WASTE WATER $850 $100 Implemented
KU0495 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,550 $490 Implemented
KU0495 # 05 Y:1998 05 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,380 $1,490 Implemented
KU0495 # 03 Y:1998 03 1998 USE SYNTHETIC LUBRICANT $3,080 $2,650 Implemented
KU0183 # 06 Y:1986 06 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $626 $750 Implemented
KU0183 # 05 Y:1986 05 1986 OPTIMIZE PLANT POWER FACTOR $1,423 $2,500 Implemented
KU0183 # 04 Y:1986 04 1986 IMPROVE LUBRICATION PRACTICES $2,059 $1,500 Implemented
KU0183 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,213 $0 Implemented
KU0183 # 01 Y:1986 01 1986 INSTALL SET-BACK TIMERS $4,326 $4,279 Implemented
KU0127 # 01 Y:1984 01 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $47,344 $2,000 Implemented
KU0127 # 12 Y:1984 12 1984 REPAIR AND ELIMINATE STEAM LEAKS $187 $60 Implemented
KU0127 # 11 Y:1984 11 1984 INSTALL TIMERS AND/OR THERMOSTATS $1,116 $300 Implemented
KU0127 # 10 Y:1984 10 1984 INSULATE BARE EQUIPMENT $1,267 $1,700 Implemented
KU0127 # 06 Y:1984 06 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,298 $0 Implemented
KU0127 # 04 Y:1984 04 1984 OPTIMIZE PLANT POWER FACTOR $18,864 $28,500 Implemented