IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

153

matching recommendations
Reset
SIC 2043 Cereal Breakfast Foods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0137 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $973 $3,500 Implemented
UU0137 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,310 $7,650 Implemented
UU0137 # 02 Y:2018 02 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,021 $24,600 Implemented
IA0557 # 04 Y:2016 04 2016 OPTIMIZE PLANT POWER FACTOR $4,037 $4,835 Not Implemented
IA0557 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,648 $189 Implemented
IA0557 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $3,284 $5,488 Not Implemented
IA0557 # 09 Y:2016 09 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $461 $35 Implemented
IA0557 # 10 Y:2016 10 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $420 $398 Not Implemented
IA0557 # 03 Y:2016 03 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,367 $29,084 Not Implemented
IA0557 # 06 Y:2016 06 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $2,719 $5,030 Implemented
IA0557 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,548 $500 Not Implemented
IA0557 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,271 $95,210 Not Implemented
IA0557 # 08 Y:2016 08 2016 INSULATE BARE EQUIPMENT $553 $242 Implemented
TT0173 # 02 Y:2016 02 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $99,071 $0 Not Implemented
TT0173 # 04 Y:2016 04 2016 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $68,525 $200,000 Not Implemented
TT0173 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $60,623 $598,903 Implemented
TT0173 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $103,506 $2,000 Not Implemented
TT0173 # 14 Y:2016 14 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $345 $800 Not Implemented
TT0173 # 12 Y:2016 12 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $2,121 $2,000 Implemented
TT0173 # 09 Y:2016 09 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,266 $25,000 Not Implemented
TT0173 # 11 Y:2016 11 2016 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $5,769 $4,000 Not Implemented
TT0173 # 07 Y:2016 07 2016 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $41,224 $33,600 Not Implemented
TT0173 # 15 Y:2016 15 2016 MINIMIZE WATER USAGE $411 $248 Not Implemented
TT0173 # 08 Y:2016 08 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,809 $3,900 Not Implemented
TT0173 # 13 Y:2016 13 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,965 $4,000 Not Implemented