IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

153

matching recommendations
Reset
SIC 2043 Cereal Breakfast Foods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW0023 # 03 Y:2009 03 2009 ADJUST BURNERS FOR EFFICIENT OPERATION $7,267 $200,000 Implemented
UW0023 # 04 Y:2009 04 2009 CONTROL PRESSURE ON STEAMER OPERATIONS $6,132 $0 Not Implemented
UW0023 # 05 Y:2009 05 2009 RECOVER WASTE HEAT FROM EQUIPMENT $4,120 $60,200 Not Implemented
CO0589 # 01 Y:2006 01 2006 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $264,540 $1,173,000 Not Implemented
CO0589 # 02 Y:2006 02 2006 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $56,580 $570 Implemented
CO0589 # 03 Y:2006 03 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $950 $500 Implemented
CO0589 # 04 Y:2006 04 2006 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $23,960 $0 Implemented
CO0589 # 05 Y:2006 05 2006 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $21,540 $100,800 Not Implemented
CO0589 # 06 Y:2006 06 2006 USE SOLAR HEAT TO MAKE ELECTRICTY $3,910 $32,600 Not Implemented
SF0311 # 01 Y:2005 01 2005 REPAIR AND ELIMINATE STEAM LEAKS $133,918 $0 Implemented
SF0311 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,048 $0 Implemented
SF0311 # 03 Y:2005 03 2005 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,110 $0 Not Implemented
SF0311 # 04 Y:2005 04 2005 REPAIR OR REPLACE STEAM TRAPS $24,768 $2,108 Implemented
SF0311 # 05 Y:2005 05 2005 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,622 $504 Not Implemented
SF0311 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,803 $2,959 Not Implemented
SF0311 # 07 Y:2005 07 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,363 $6,375 Implemented
SF0311 # 08 Y:2005 08 2005 USE PHOTOCELL CONTROLS $412 $480 Not Implemented
SF0311 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,804 $2,332 Not Implemented
SF0311 # 10 Y:2005 10 2005 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $3,402 $5,030 Not Implemented
SF0311 # 11 Y:2005 11 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $456 $693 Not Implemented
SF0311 # 12 Y:2005 12 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,102 $18,405 Not Implemented
SF0311 # 13 Y:2005 13 2005 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $345 $658 Not Implemented
SF0311 # 14 Y:2005 14 2005 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $22,029 $46,851 Not Implemented
SF0311 # 15 Y:2005 15 2005 $3,118 $13,200 Not Implemented
SF0311 # 16 Y:2005 16 2005 ELIMINATE/REDUCE AN OPERATION $1,600 $0 Not Implemented