IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

305

matching recommendations
Reset
SIC 2047 Dog And Cat Food
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0340 # 03 Y:2004 03 2004 CONTROL PRESSURE ON STEAMER OPERATIONS $18,750 $4,940 Implemented
IA0340 # 01 Y:2004 01 2004 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $1,674 $2,382 Not Implemented
IA0340 # 02 Y:2004 02 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,101 $1,000 Implemented
IA0340 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $343 $263 Not Implemented
IA0340 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $686 $962 Implemented
IA0340 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,946 $135 Implemented
IA0340 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,093 $4,412 Not Implemented
IA0340 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,397 $1,494 Not Implemented
IA0340 # 10 Y:2004 10 2004 USE SCREENING, MAGNETIC SEPARATION TO REMOVE CONTAMINANTS $12,424 $12,000 Not Implemented
IA0340 # 11 Y:2004 11 2004 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $16,000 $36,000 Implemented
IA0340 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $787 $1,397 Not Implemented
UD0655 # 04 Y:2002 04 2002 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,492 $500 Not Implemented
UD0655 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,350 $1,122 Implemented
UD0655 # 03 Y:2002 03 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,888 $0 Not Implemented
UD0655 # 08 Y:2002 08 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $909 $0 Not Implemented
UD0655 # 05 Y:2002 05 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,914 $0 Not Implemented
UD0655 # 06 Y:2002 06 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $1,566 $3,665 Not Implemented
UD0655 # 01 Y:2002 01 2002 DEVELOP STANDARD OPERATING PROCEDURES $147,420 $0 Implemented
UD0655 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,204 $2,418 Implemented
OK0615 # 09 Y:2001 09 2001 CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS $13,745 $240 Implemented
OK0615 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,895 $5,476 Implemented
OK0615 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,798 $913 Not Implemented
OK0615 # 10 Y:2001 10 2001 REPLACE BOILER $7,761 $22,000 Not Implemented
OK0615 # 05 Y:2001 05 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $1,147 $238 Not Implemented
OK0615 # 07 Y:2001 07 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $536 $163 Implemented