IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

297

matching recommendations
Reset
SIC 2047 Dog And Cat Food
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0546 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $870 $740 Implemented
ND0324 # 01 Y:1999 01 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $802 $1,525 Not Implemented
ND0324 # 02 Y:1999 02 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,051 $250 Implemented
ND0324 # 03 Y:1999 03 1999 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $7,258 $30,000 Implemented
ND0324 # 04 Y:1999 04 1999 DEVELOP A REPAIR/REPLACE POLICY $52,604 $41,503 Not Implemented
ND0324 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $459 $1,800 Not Implemented
ND0324 # 06 Y:1999 06 1999 $-252 $0 Not Implemented
ND0324 # 07 Y:1999 07 1999 REDUCE SCRAP PRODUCTION $11,250 $7,200 Implemented
AM0339 # 01 Y:1999 01 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $13,450 $5,500 Not Implemented
AM0339 # 02 Y:1999 02 1999 REPAIR AND ELIMINATE STEAM LEAKS $2,575 $1,500 Implemented
AM0339 # 03 Y:1999 03 1999 USE SYNTHETIC LUBRICANT $2,120 $0 Not Implemented
AM0339 # 04 Y:1999 04 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,030 $500 Not Implemented
AM0339 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN WATER LINES AND VALVES $830 $64 Implemented
AM0339 # 06 Y:1999 06 1999 INSULATE BARE EQUIPMENT $500 $212 Not Implemented
AM0339 # 07 Y:1999 07 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $500 $0 Implemented
AM0339 # 08 Y:1999 08 1999 INSULATE BARE EQUIPMENT $240 $1,360 Implemented
AM0339 # 09 Y:1999 09 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $125 $180 Not Implemented
AS0186 # 01 Y:1996 01 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,586 $16,140 Implemented
AS0186 # 02 Y:1996 02 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,274 $5,945 Implemented
AS0186 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,734 $7,000 Implemented
AS0186 # 04 Y:1996 04 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,738 $0 Implemented
AS0186 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,675 $2,086 Implemented
AS0186 # 06 Y:1996 06 1996 INSTALL OCCUPANCY SENSORS $712 $525 Implemented
AS0186 # 07 Y:1996 07 1996 METER WASTE WATER $8,798 $5,000 Implemented
AS0186 # 08 Y:1996 08 1996 CONTRACT A WOOD PALLET RECYCLING COMPANY $465 $0 Implemented