IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
SIC 2048 Prepared Feeds, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0507 # 10 Y:2013 10 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,053 $13,600 Implemented
IA0507 # 09 Y:2013 09 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,196 $10,318 Implemented
IA0507 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $576 $25 Implemented
IA0507 # 07 Y:2013 07 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $792 $650 Implemented
IA0507 # 06 Y:2013 06 2013 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,342 $500 Not Implemented
IA0507 # 05 Y:2013 05 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,342 $1,000 Implemented
IA0507 # 04 Y:2013 04 2013 INSULATE BARE EQUIPMENT $9,686 $7,803 Implemented
IA0507 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $2,933 $2,826 Implemented
IA0507 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,279 $1,198 Implemented
IA0507 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,483 $4,993 Implemented
IA0178 # 05 Y:1997 05 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $2,100 $8,100 Implemented
IA0178 # 07 Y:1997 07 1997 IMPROVE HANDLING PRACTICES $91,000 $4,500 Implemented
IA0178 # 06 Y:1997 06 1997 RECOVER AND REUSE COOLING WATER $3,700 $5,453 Implemented
IA0178 # 04 Y:1997 04 1997 INSTALL OCCUPANCY SENSORS $166 $630 Not Implemented
IA0178 # 03 Y:1997 03 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $538 $50 Implemented
IA0178 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,223 $1,915 Implemented
IA0178 # 01 Y:1997 01 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,051 $1,100 Implemented
DS0044 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,508 $4,325 Implemented
DS0044 # 08 Y:1995 08 1995 INSULATE BARE EQUIPMENT $168 $263 Not Implemented
DS0044 # 07 Y:1995 07 1995 RECOVER WASTE HEAT FROM EQUIPMENT $1,035 $2,000 Not Implemented
DS0044 # 06 Y:1995 06 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $135 $135 Implemented
DS0044 # 05 Y:1995 05 1995 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $504 $290 Not Implemented
DS0044 # 04 Y:1995 04 1995 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,652 $170 Implemented
DS0044 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,828 $15,870 Implemented
DS0044 # 02 Y:1995 02 1995 INSTALL OCCUPANCY SENSORS $570 $400 Implemented