Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
116
matching recommendationsSIC | 2048 | Prepared Feeds, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1047 # 04 Y:2021 | 04 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $876 | $500 | Implemented |
OK1047 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,212 | $1,242 | Implemented |
OK1047 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,774 | $6,045 | Implemented |
OK1047 # 01 Y:2021 | 01 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,181 | $17,737 | Implemented |
OK1021 # 05 Y:2019 | 05 | 2019 | INSTALL SUB-METERING EQUIPMENT | $5,665 | $887 | Not Implemented |
OK1021 # 04 Y:2019 | 04 | 2019 | INSTALL / REPAIR INSULATION ON STEAM LINES | $6,865 | $426 | Implemented |
OK1021 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,570 | $850 | Implemented |
OK1021 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,490 | $4,312 | Implemented |
OK1021 # 01 Y:2019 | 01 | 2019 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $957 | $524 | Implemented |
OK0937 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,667 | $5,324 | Implemented |
OK0937 # 01 Y:2016 | 01 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,095 | $1,646 | Not Implemented |
OK0937 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,346 | $88,560 | Implemented |
OK0937 # 04 Y:2016 | 04 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,363 | $15,376 | Not Implemented |
OK0937 # 05 Y:2016 | 05 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,445 | $12,000 | Implemented |
OK0937 # 07 Y:2016 | 07 | 2016 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $74,720 | $594,190 | Not Implemented |
OK0937 # 08 Y:2016 | 08 | 2016 | OPTIMIZE PLANT POWER FACTOR | $9,089 | $6,160 | Not Implemented |
OK0937 # 09 Y:2016 | 09 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $29,032 | $132,000 | Not Implemented |
OK0937 # 06 Y:2016 | 06 | 2016 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,197 | $2,060 | Not Implemented |
OK0857 # 01 Y:2013 | 01 | 2013 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $46,232 | $492,750 | Not Implemented |
OK0803 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $74 | $524 | Not Implemented |
OK0803 # 01 Y:2011 | 01 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $17,686 | $22,080 | Implemented |
OK0803 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,156 | $13,723 | Not Implemented |
OK0803 # 04 Y:2011 | 04 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,212 | $2,024 | Not Implemented |
OK0803 # 07 Y:2011 | 07 | 2011 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,821 | $18,906 | Implemented |
OK0803 # 05 Y:2011 | 05 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $208 | $300 | Implemented |