Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsSIC | 205 | Bakery Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0768 # 01 Y:2023 | 01 | 2023 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $18,535 | $8,125 | Implemented |
OR0768 # 03 Y:2023 | 03 | 2023 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $11,178 | $5,693 | Implemented |
OR0735 # 01 Y:2020 | 01 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $5,347 | $1,090 | Implemented |
OR0735 # 03 Y:2020 | 03 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $3,031 | $0 | Implemented |
OR0647 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,576 | $25,575 | Implemented |
OR0647 # 01 Y:2015 | 01 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,826 | $4,986 | Implemented |
OR0641 # 05 Y:2014 | 05 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $581 | $1,121 | Implemented |
OR0641 # 04 Y:2014 | 04 | 2014 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,470 | $1,577 | Implemented |
OR0641 # 02 Y:2014 | 02 | 2014 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $13,580 | $8,760 | Implemented |
OR0641 # 01 Y:2014 | 01 | 2014 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $17,076 | $2,794 | Implemented |
OR0499 # 01 Y:2006 | 01 | 2006 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $77,273 | $12,000 | Implemented |
OR0499 # 02 Y:2006 | 02 | 2006 | $30,000 | $18,000 | Implemented | |
OR0499 # 03 Y:2006 | 03 | 2006 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $5,200 | $0 | Implemented |
OR0499 # 04 Y:2006 | 04 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,900 | $570 | Implemented |
OR0499 # 05 Y:2006 | 05 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,960 | $3,700 | Implemented |
OR0499 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,700 | $12,700 | Implemented |
OR0499 # 07 Y:2006 | 07 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,700 | $5,700 | Implemented |
OR0499 # 09 Y:2006 | 09 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $6,400 | $19,000 | Implemented |
OR0499 # 10 Y:2006 | 10 | 2006 | OPTIMIZE PLANT POWER FACTOR | $2,460 | $8,200 | Implemented |
OR0327 # 06 Y:1998 | 06 | 1998 | PAY BILLS ON TIME TO AVOID LATE FEES | $986 | $0 | Implemented |
OR0327 # 01 Y:1998 | 01 | 1998 | CLEAR AND RENT EXISTING SPACE | $176,000 | $200,000 | Implemented |
OR0327 # 09 Y:1998 | 09 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,863 | $0 | Implemented |
OR0327 # 08 Y:1998 | 08 | 1998 | USE PHOTOCELL CONTROLS | $1,460 | $500 | Implemented |
OR0327 # 07 Y:1998 | 07 | 1998 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $577 | $411 | Implemented |
OR0327 # 04 Y:1998 | 04 | 1998 | MOVE PRODUCT USING MECHANICAL MEANS | $12,158 | $28,400 | Implemented |