Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
39
matching recommendationsSIC | 205 | Bakery Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW2303 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $590 | $124 | Not Implemented |
UW2303 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $687 | $1,488 | Not Implemented |
UW2303 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $702 | $959 | Not Implemented |
UW2303 # 06 Y:2023 | 06 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,084 | $5,025 | Not Implemented |
UW2303 # 05 Y:2023 | 05 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $199 | $282 | Not Implemented |
UW2303 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,161 | $624 | Not Implemented |
BS0117 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,573 | $1,650 | Not Implemented |
BS0117 # 05 Y:2019 | 05 | 2019 | ISOLATE HOT OR COLD EQUIPMENT | $3,322 | $502 | Not Implemented |
BS0117 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,373 | $350 | Not Implemented |
BS0117 # 02 Y:2019 | 02 | 2019 | INSULATE BARE EQUIPMENT | $413 | $1,047 | Not Implemented |
BS0117 # 01 Y:2019 | 01 | 2019 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $32,085 | $5,600 | Not Implemented |
BS0068 # 05 Y:2015 | 05 | 2015 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $12,480 | $11,240 | Not Implemented |
BS0068 # 01 Y:2015 | 01 | 2015 | USE OPTIMUM THICKNESS INSULATION | $70 | $51 | Not Implemented |
BS0068 # 04 Y:2015 | 04 | 2015 | USE OPTIMUM THICKNESS INSULATION | $29 | $100 | Not Implemented |
BS0068 # 03 Y:2015 | 03 | 2015 | AIR CONDITION ONLY SPACE NECESSARY | $1,060 | $4,455 | Not Implemented |
BS0068 # 02 Y:2015 | 02 | 2015 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $1,272 | $5,853 | Not Implemented |
OR0613 # 04 Y:2013 | 04 | 2013 | RECOVER AND REUSE WASTE MATERIAL | $3,635 | $8,000 | Not Implemented |
OR0613 # 01 Y:2013 | 01 | 2013 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $11,140 | $5,000 | Implemented |
OR0613 # 02 Y:2013 | 02 | 2013 | INSTALL OCCUPANCY SENSORS | $3,040 | $2,913 | Not Implemented |
OR0613 # 03 Y:2013 | 03 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $11,262 | $36,000 | Implemented |
OR0613 # 06 Y:2013 | 06 | 2013 | INSTALL TIMERS AND/OR THERMOSTATS | $991 | $95 | Implemented |
OR0613 # 07 Y:2013 | 07 | 2013 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $706 | $448 | Implemented |
OR0613 # 05 Y:2013 | 05 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,364 | $17,632 | Not Implemented |
OR0511 # 07 Y:2006 | 07 | 2006 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $3,800 | $4,500 | Not Implemented |
OR0511 # 08 Y:2006 | 08 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,600 | $5,000 | Implemented |