IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

67

matching recommendations
Reset
SIC 205 Bakery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0364 # 06 Y:1992 06 1992 KEEP BOILER TUBES CLEAN $561 $135 Implemented
KU0364 # 05 Y:1992 05 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $484 $771 Implemented
KU0364 # 04 Y:1992 04 1992 INSTALL SET-BACK TIMERS $568 $400 Not Implemented
KU0364 # 02 Y:1992 02 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,102 $2,000 Implemented
KU0364 # 01 Y:1992 01 1992 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $24,869 $10,000 Not Implemented
KU0349 # 10 Y:1991 10 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $222 $380 Not Implemented
KU0349 # 09 Y:1991 09 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $829 $410 Not Implemented
KU0349 # 08 Y:1991 08 1991 OPTIMIZE PLANT POWER FACTOR $1,702 $3,024 Not Implemented
KU0349 # 07 Y:1991 07 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $413 $0 Not Implemented
KU0349 # 06 Y:1991 06 1991 USE MINIMUM SAFE OVEN VENTILATION $1,377 $0 Not Implemented
KU0349 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $677 $850 Not Implemented
KU0349 # 04 Y:1991 04 1991 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $934 $1,500 Not Implemented
KU0349 # 03 Y:1991 03 1991 INSTALL SET-BACK TIMERS $1,110 $200 Not Implemented
KU0349 # 02 Y:1991 02 1991 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,460 $2,800 Not Implemented
KU0349 # 11 Y:1991 11 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $128 $0 Not Implemented
KU0349 # 01 Y:1991 01 1991 ISOLATE HOT OR COLD EQUIPMENT $4,092 $5,200 Not Implemented
OK0294 # 01 Y:1989 01 1989 RECOVER WASTE HEAT FROM EQUIPMENT $2,730 $818 Implemented
OK0294 # 06 Y:1989 06 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,180 $7,140 Implemented
OK0294 # 05 Y:1989 05 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $277 $229 Implemented
OK0294 # 04 Y:1989 04 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $555 $1,500 Implemented
OK0294 # 03 Y:1989 03 1989 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $5,053 $8,840 Implemented
OK0294 # 02 Y:1989 02 1989 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,202 $7,214 Implemented
KU0129 # 02 Y:1984 02 1984 RECOVER WASTE HEAT FROM EQUIPMENT $8,014 $6,400 Not Implemented
KU0129 # 07 Y:1984 07 1984 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,524 $8,000 Not Implemented
KU0129 # 09 Y:1984 09 1984 INCREASE AMOUNT OF CONDENSATE RETURNED $2,264 $2,500 Implemented