Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,417
matching recommendationsSIC | 205 | Bakery Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LM0033 # 04 Y:2002 | 04 | 2002 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $23,073 | $31,000 | Not Implemented |
LM0033 # 05 Y:2002 | 05 | 2002 | USE OPTIMUM THICKNESS INSULATION | $64,833 | $96,800 | Not Implemented |
LM0033 # 06 Y:2002 | 06 | 2002 | UTILIZE OUTSIDE CONTRACTING | $22,623 | $12,000 | Not Implemented |
LM0033 # 07 Y:2002 | 07 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $243,003 | $208,000 | Not Implemented |
LM0033 # 08 Y:2002 | 08 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $237,812 | $70,000 | Not Implemented |
LM0033 # 09 Y:2002 | 09 | 2002 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $90,240 | $34,800 | Not Implemented |
LM0033 # 10 Y:2002 | 10 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $231,120 | $395,000 | Not Implemented |
MI0029 # 01 Y:2002 | 01 | 2002 | METER WASTE WATER | $73,069 | $3,650 | Not Implemented |
MI0029 # 02 Y:2002 | 02 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $55,380 | $42,432 | Not Implemented |
MI0029 # 03 Y:2002 | 03 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $19,287 | $1,550 | Implemented |
MI0029 # 04 Y:2002 | 04 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $15,657 | $2,122 | Implemented |
MI0029 # 05 Y:2002 | 05 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,668 | $3 | Implemented |
AS0294 # 01 Y:2001 | 01 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,268 | $2,070 | Implemented |
AS0294 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,366 | $6,076 | Implemented |
AS0294 # 03 Y:2001 | 03 | 2001 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,492 | $15,000 | Implemented |
AS0294 # 04 Y:2001 | 04 | 2001 | INSTALL SKYLIGHTS | $1,527 | $3,086 | Not Implemented |
UF0288 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,662 | $6,465 | Not Implemented |
UF0288 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,358 | $500 | Implemented |
UF0288 # 03 Y:2001 | 03 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $18,443 | $30,000 | Not Implemented |
UF0288 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,155 | $0 | Implemented |
UF0288 # 05 Y:2001 | 05 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $800 | $2,000 | Not Implemented |
UF0288 # 06 Y:2001 | 06 | 2001 | MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE | $720,000 | $559,440 | Not Implemented |
UF0288 # 07 Y:2001 | 07 | 2001 | INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM | $169,000 | $176,000 | Implemented |
UF0288 # 08 Y:2001 | 08 | 2001 | INSTALL BACK-UP EQUIPMENT | $29,400 | $64,000 | Implemented |
CO0490 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,850 | $630 | n/a |