Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
35
matching recommendationsSIC | 205 | Bakery Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0267 # 03 Y:2022 | 03 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $2,954 | $1,360 | Implemented |
UA0267 # 01 Y:2022 | 01 | 2022 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $13,660 | $51,749 | Not Implemented |
UA0267 # 04 Y:2022 | 04 | 2022 | OPTIMIZE PLANT POWER FACTOR | $2,388 | $1,682 | Not Implemented |
UA0267 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,033 | $1,000 | Implemented |
UA0267 # 05 Y:2022 | 05 | 2022 | INSTALL OCCUPANCY SENSORS | $677 | $901 | Implemented |
UA0266 # 02 Y:2022 | 02 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,514 | $8,397 | Not Implemented |
UA0266 # 06 Y:2022 | 06 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $894 | $558 | Not Implemented |
UA0266 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $19,219 | $1,000 | Not Implemented |
UA0266 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,871 | $22,132 | Not Implemented |
UA0266 # 04 Y:2022 | 04 | 2022 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,089 | $188 | Not Implemented |
UA0266 # 03 Y:2022 | 03 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $1,950 | $865 | Not Implemented |
UA0265 # 05 Y:2022 | 05 | 2022 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $33,503 | $34,984 | Not Implemented |
UA0265 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,413 | $5,533 | Not Implemented |
UA0265 # 03 Y:2022 | 03 | 2022 | OPTIMIZE PLANT POWER FACTOR | $14,987 | $4,205 | Not Implemented |
UA0265 # 02 Y:2022 | 02 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,737 | $23,601 | Not Implemented |
UA0265 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,134 | $400 | Not Implemented |
UA0018 # 10 Y:2008 | 10 | 2008 | INSTALL AUTOMATIC STACK DAMPER | $78,268 | $3,900 | Not Implemented |
UA0018 # 11 Y:2008 | 11 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $22,404 | $30,900 | Not Implemented |
UA0018 # 01 Y:2008 | 01 | 2008 | UPGRADE CONTROLS ON COMPRESSORS | $28,103 | $15,000 | Not Implemented |
UA0018 # 09 Y:2008 | 09 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,739 | $10,237 | Not Implemented |
UA0018 # 07 Y:2008 | 07 | 2008 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $14,000 | $1,000 | Implemented |
UA0018 # 06 Y:2008 | 06 | 2008 | INSULATE BARE EQUIPMENT | $5,592 | $840 | Implemented |
UA0018 # 05 Y:2008 | 05 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,848 | $6,050 | Implemented |
UA0018 # 04 Y:2008 | 04 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $21,032 | $15,500 | Not Implemented |
UA0018 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,686 | $5,000 | Implemented |