IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

97

matching recommendations
Reset
SIC 205 Bakery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0591 # 04 Y:2023 04 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $27,896 $8,591 Implemented
UF0591 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,481 $66,747 Implemented
UF0591 # 05 Y:2023 05 2023 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $12,470 $19,320 Implemented
UF0591 # 07 Y:2023 07 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,713 $0 Implemented
UF0591 # 06 Y:2023 06 2023 INSTALL SUB-METERING EQUIPMENT $2,168 $8,880 Implemented
UF0591 # 02 Y:2023 02 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $48,128 $44,635 Implemented
UF0590 # 04 Y:2023 04 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $31,115 $12,420 Implemented
UF0590 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $90,544 $67,849 Implemented
UF0590 # 05 Y:2023 05 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,955 $25,440 Implemented
UF0590 # 06 Y:2023 06 2023 INSTALL SUB-METERING EQUIPMENT $10,106 $11,100 Implemented
UF0590 # 03 Y:2023 03 2023 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $16,705 $11,574 Implemented
UF0590 # 07 Y:2023 07 2023 REPAIR AND ELIMINATE STEAM LEAKS $3,034 $528 Implemented
UF0590 # 08 Y:2023 08 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $79,607 $10,000 Implemented
UF0574 # 13 Y:2022 13 2022 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $16,503 $80,000 Implemented
UF0574 # 15 Y:2022 15 2022 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,082 $88 Implemented
UF0574 # 06 Y:2022 06 2022 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $5,512 $600 Implemented
UF0574 # 04 Y:2022 04 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,484 $20,340 Implemented
UF0574 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $57,729 $322,608 Implemented
UF0574 # 12 Y:2022 12 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $22,157 $0 Implemented
UF0574 # 02 Y:2022 02 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $38,315 $45,847 Implemented
UF0574 # 07 Y:2022 07 2022 OPTIMIZE PLANT POWER FACTOR $5,422 $24,763 Implemented
UF0574 # 11 Y:2022 11 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $287,926 $0 Implemented
UF0574 # 03 Y:2022 03 2022 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $22,318 $12,420 Implemented
UF0574 # 14 Y:2022 14 2022 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $18,108 $45,538 Implemented
UF0574 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,896 $25,258 Implemented