IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 205 Bakery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0500 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,087 $14,773 Implemented
SU0461 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $272 $397 Implemented
SU0461 # 02 Y:2018 02 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,138 $700 Implemented
SU0461 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,640 $27,679 Implemented
SU0461 # 07 Y:2018 07 2018 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $315 $955 Implemented
SU0443 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,477 $665 Implemented
SU0443 # 02 Y:2017 02 2017 DISCONNECT BALLASTS $425 $0 Implemented
SU0443 # 01 Y:2017 01 2017 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,819 $0 Implemented
SU0443 # 10 Y:2017 10 2017 UPGRADE OBSOLETE EQUIPMENT $86 $243 Implemented
SU0443 # 06 Y:2017 06 2017 INSTALL OCCUPANCY SENSORS $178 $426 Implemented
SU0443 # 04 Y:2017 04 2017 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $4,829 $2,540 Implemented
SU0385 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,815 $0 Implemented
SU0385 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $424 $1,010 Implemented
SU0385 # 06 Y:2015 06 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $78,891 $97,500 Implemented
SU0385 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $930 $1,060 Implemented
SU0385 # 04 Y:2015 04 2015 INSULATE BARE EQUIPMENT $2,578 $370 Implemented
SU0385 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,452 $1,124 Implemented
SU0225 # 04 Y:2006 04 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,730 $0 Implemented
SU0225 # 01 Y:2006 01 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $35,891 $0 Implemented
SU0225 # 11 Y:2006 11 2006 OPTIMIZE PLANT POWER FACTOR $9,250 $12,757 Implemented
SU0225 # 10 Y:2006 10 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,864 $20,100 Implemented
SU0225 # 09 Y:2006 09 2006 INSTALL OCCUPANCY SENSORS $471 $532 Implemented
SU0225 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $606 $653 Implemented
SU0225 # 07 Y:2006 07 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $3,373 $250 Implemented
SU0225 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,994 $1,058 Implemented