IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

78

matching recommendations
Reset
SIC 2051 Bread, Cake, And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0511 # 09 Y:2006 09 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,400 $2,600 Not Implemented
OR0511 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $10,500 $7,340 Not Implemented
OR0511 # 02 Y:2006 02 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $35,500 $8,000 Implemented
OR0511 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,800 $0 Implemented
OR0511 # 01 Y:2006 01 2006 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,200,000 $400,000 Implemented
OR0511 # 04 Y:2006 04 2006 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $14,400 $13,700 Implemented
OR0511 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,300 $6,300 Implemented
OR0511 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,600 $5,000 Implemented
OR0511 # 07 Y:2006 07 2006 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $3,800 $4,500 Not Implemented
SD0390 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,427 $5,265 Implemented
SD0390 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,382 $120 Not Implemented
SD0390 # 04 Y:2006 04 2006 USE PHOTOCELL CONTROLS $9,145 $1,404 Not Implemented
SD0390 # 05 Y:2006 05 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,469 $6,600 Implemented
SD0390 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $14,632 $13,345 Not Implemented
SD0390 # 06 Y:2006 06 2006 UPGRADE CONTROLS ON COMPRESSORS $3,452 $168 Implemented
SD0390 # 01 Y:2006 01 2006 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $171,093 $182,800 Not Implemented
SD0390 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,435 $42,808 Implemented
SD0388 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,328 $36,752 Implemented
SD0388 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $3,744 $1,280 Not Implemented
SD0388 # 04 Y:2006 04 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,788 $13,700 Implemented
SD0388 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,306 $0 Implemented
SD0388 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,880 $49,394 Implemented
SD0388 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,284 $80,876 Implemented
IC0121 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $440 $1,664 Implemented
IC0121 # 05 Y:2006 05 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $20,185 $115,000 Not Implemented