Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
375
matching recommendationsSIC | 2052 | Cookies And Crackers |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0413 # 03 Y:2023 | 03 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $35,830 | $456,750 | n/a |
MS0413 # 02 Y:2023 | 02 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,194 | $17,530 | n/a |
TT0290 # 03 Y:2023 | 03 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,477 | $10,500 | Not Implemented |
TT0290 # 06 Y:2023 | 06 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $523 | $1,150 | Implemented |
TT0290 # 05 Y:2023 | 05 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $911 | $30 | Implemented |
TT0290 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,702 | $1,755 | Implemented |
TT0290 # 01 Y:2023 | 01 | 2023 | UPGRADE OBSOLETE EQUIPMENT | $106,623 | $200,000 | Implemented |
TT0290 # 02 Y:2023 | 02 | 2023 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $21,000 | $2,000 | Not Implemented |
IC0247 # 02 Y:2021 | 02 | 2021 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,646 | $64,258 | Implemented |
IC0247 # 05 Y:2021 | 05 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,246 | $207 | Not Implemented |
IC0247 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,735 | $1,539 | Implemented |
IC0247 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,040 | $5,000 | Implemented |
IC0247 # 07 Y:2021 | 07 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,269 | $24,850 | Not Implemented |
IC0247 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,752 | $1,964 | Not Implemented |
IC0247 # 06 Y:2021 | 06 | 2021 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $283 | $578 | Not Implemented |
MZ0277 # 06 Y:2019 | 06 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $55,889 | $160 | Implemented |
MZ0277 # 05 Y:2019 | 05 | 2019 | INSTALL SPECTRAL REFLECTORS / DELAMP | $8,418 | $1,920 | Not Implemented |
MZ0277 # 04 Y:2019 | 04 | 2019 | INSTALL OCCUPANCY SENSORS | $1,650 | $2,700 | Implemented |
MZ0277 # 02 Y:2019 | 02 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $28,719 | $50,000 | Not Implemented |
MZ0277 # 01 Y:2019 | 01 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,394 | $440 | Not Implemented |
MZ0277 # 07 Y:2019 | 07 | 2019 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $70,665 | $233,814 | Implemented |
MZ0277 # 08 Y:2019 | 08 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,816 | $3,021 | Implemented |
MZ0277 # 09 Y:2019 | 09 | 2019 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $409 | $1,200 | Implemented |
MZ0277 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,416 | $4,211 | Implemented |
UF0515 # 05 Y:2018 | 05 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,553 | $2,800 | Implemented |