Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
149
matching recommendationsSIC | 206 | Sugar And Confectionery Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0611 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $165,339 | $1,651,070 | Implemented |
SF0611 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $14,817 | $0 | Implemented |
SF0611 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $61,975 | $1,800 | Implemented |
SF0611 # 02 Y:2024 | 02 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,908 | $0 | Implemented |
SF0608 # 05 Y:2023 | 05 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $11,235 | $4,654 | Implemented |
SF0608 # 01 Y:2023 | 01 | 2023 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $16,747 | $400 | Implemented |
SF0608 # 03 Y:2023 | 03 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $29,842 | $690 | Implemented |
SF0608 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,322 | $0 | Implemented |
SF0608 # 08 Y:2023 | 08 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $39,597 | $29,794 | Implemented |
SF0608 # 04 Y:2023 | 04 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,050 | $0 | Implemented |
SJ0005 # 06 Y:2023 | 06 | 2023 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $5,992 | $2,536 | Implemented |
SJ0005 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,218 | $962 | Implemented |
SF0572 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $16,373 | $200 | Implemented |
SF0572 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,781 | $1,200 | Implemented |
SF0572 # 10 Y:2021 | 10 | 2021 | INSTALL SUB-METERING EQUIPMENT | $8,446 | $6,896 | Implemented |
SF0556 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,769 | $2,289 | Implemented |
SF0556 # 08 Y:2020 | 08 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,676 | $16,092 | Implemented |
SF0556 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,729 | $864 | Implemented |
SF0556 # 07 Y:2020 | 07 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,455 | $3,366 | Implemented |
SF0556 # 06 Y:2020 | 06 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,238 | $5,536 | Implemented |
SF0556 # 09 Y:2020 | 09 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $57,865 | $348,493 | Implemented |
SF0556 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,802 | $0 | Implemented |
SF0556 # 02 Y:2020 | 02 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,683 | $575 | Implemented |
SF0556 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $959 | $60 | Implemented |
SF0553 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,905 | $120 | Implemented |