Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,009
matching recommendationsSIC | 206 | Sugar And Confectionery Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0023 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,844 | $59 | Not Implemented |
IP0023 # 04 Y:2014 | 04 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $66 | $13 | Not Implemented |
IP0023 # 05 Y:2014 | 05 | 2014 | INSTALL OCCUPANCY SENSORS | $43 | $30 | Not Implemented |
IP0023 # 06 Y:2014 | 06 | 2014 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $2,202 | $1,970 | Not Implemented |
IP0023 # 07 Y:2014 | 07 | 2014 | HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS | $20,119 | $16,444 | Not Implemented |
IP0023 # 08 Y:2014 | 08 | 2014 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $2,491 | $2,716 | Not Implemented |
IP0023 # 09 Y:2014 | 09 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $124 | $245 | Not Implemented |
BS0019 # 01 Y:2013 | 01 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $187 | $364 | Not Implemented |
BS0019 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $342 | $349 | Implemented |
BS0019 # 03 Y:2013 | 03 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $84 | $157 | Not Implemented |
BS0019 # 04 Y:2013 | 04 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $41 | $81 | Implemented |
BS0019 # 05 Y:2013 | 05 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $47 | $36 | Implemented |
BS0019 # 06 Y:2013 | 06 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $197 | $349 | Implemented |
BS0019 # 07 Y:2013 | 07 | 2013 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $23 | $25 | Implemented |
BS0019 # 08 Y:2013 | 08 | 2013 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $310 | $25 | Not Implemented |
BS0019 # 09 Y:2013 | 09 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $165 | $120 | Implemented |
BS0019 # 10 Y:2013 | 10 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $142 | $551 | Implemented |
UM0427 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,442 | $10,650 | Not Implemented |
UM0427 # 02 Y:2013 | 02 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $13,680 | $9,000 | Implemented |
UM0427 # 03 Y:2013 | 03 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $21,140 | $5,000 | Not Implemented |
UM0427 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,906 | $6,500 | Implemented |
UM0427 # 05 Y:2013 | 05 | 2013 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $196,098 | $500,000 | Not Implemented |
UM0427 # 06 Y:2013 | 06 | 2013 | INSTALL EFFICIENT RECTIFIERS | $20,863 | $12,000 | Not Implemented |
SF0429 # 01 Y:2013 | 01 | 2013 | OPERATE BOILERS ON HIGH FIRE SETTING | $18,109 | $0 | Not Implemented |
SF0429 # 02 Y:2013 | 02 | 2013 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $578 | $810 | Implemented |