Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,009
matching recommendationsSIC | 206 | Sugar And Confectionery Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0386 # 07 Y:2010 | 07 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $217 | $461 | Not Implemented |
TT0053 # 01 Y:2010 | 01 | 2010 | ELIMINATE/REDUCE AN OPERATION | $55,600 | $0 | Not Implemented |
TT0053 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,700 | $10,500 | Implemented |
TT0053 # 03 Y:2010 | 03 | 2010 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $3,000 | $10 | Implemented |
TT0053 # 04 Y:2010 | 04 | 2010 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $2,700 | $1,000 | Implemented |
TT0053 # 05 Y:2010 | 05 | 2010 | USE PHOTOCELL CONTROLS | $340 | $520 | Not Implemented |
SF0385 # 01 Y:2010 | 01 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,418 | $0 | Implemented |
SF0385 # 02 Y:2010 | 02 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $12,270 | $0 | Implemented |
SF0385 # 03 Y:2010 | 03 | 2010 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $23,195 | $1,760 | Implemented |
SF0385 # 04 Y:2010 | 04 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,136 | $373 | Not Implemented |
SF0385 # 05 Y:2010 | 05 | 2010 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,350 | $771 | Not Implemented |
SF0385 # 06 Y:2010 | 06 | 2010 | USE PHOTOCELL CONTROLS | $14,856 | $6,800 | Implemented |
SF0385 # 07 Y:2010 | 07 | 2010 | INSULATE BARE EQUIPMENT | $1,608 | $750 | Implemented |
SF0385 # 08 Y:2010 | 08 | 2010 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $187 | $154 | Not Implemented |
SF0385 # 09 Y:2010 | 09 | 2010 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $640 | $633 | Implemented |
SF0385 # 10 Y:2010 | 10 | 2010 | INSTALL OCCUPANCY SENSORS | $5,266 | $5,951 | Implemented |
SF0385 # 11 Y:2010 | 11 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $97,444 | $119,566 | Not Implemented |
SF0385 # 12 Y:2010 | 12 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,533 | $20,000 | Not Implemented |
SF0385 # 13 Y:2010 | 13 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,444 | $7,188 | Not Implemented |
SF0385 # 14 Y:2010 | 14 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $24,082 | $12,770 | Implemented |
SF0385 # 15 Y:2010 | 15 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,355 | $18,588 | Not Implemented |
SF0385 # 16 Y:2010 | 16 | 2010 | OPTIMIZE PLANT POWER FACTOR | $9,677 | $23,715 | Implemented |
SF0385 # 17 Y:2010 | 17 | 2010 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $57,997 | $240,000 | Not Implemented |
SF0385 # 18 Y:2010 | 18 | 2010 | USE OPTIMUM THICKNESS INSULATION | $36,228 | $325,369 | Implemented |
UW0041 # 03 Y:2010 | 03 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $521 | $261 | Implemented |