IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 206 Sugar And Confectionery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0085 # 01 Y:2023 01 2023 ADOPT IN-HOUSE MATERIAL GENERATION $50,849 $76,500 n/a
NL0085 # 04 Y:2023 04 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $808 $25 n/a
NL0085 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,711 $26,296 n/a
NL0085 # 03 Y:2023 03 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,403 $10,178 n/a
NL0085 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $469 $525 n/a
KU0435 # 07 Y:1994 07 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $404 $120 Not Implemented
KU0435 # 06 Y:1994 06 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $584 $197 Not Implemented
KU0435 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $440 $504 Not Implemented
KU0435 # 04 Y:1994 04 1994 INSTALL OCCUPANCY SENSORS $996 $400 Not Implemented
KU0435 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,262 $8,110 Not Implemented
KU0435 # 02 Y:1994 02 1994 INSULATE BARE EQUIPMENT $2,005 $3,213 Not Implemented
KU0435 # 01 Y:1994 01 1994 DIRECT WARMEST AIR TO COMBUSTION INTAKE $6,681 $1,800 Not Implemented
CO0117 # 01 Y:1988 01 1988 INSTALL / REPAIR INSULATION ON STEAM LINES $4,830 $10,130 Implemented
CO0117 # 03 Y:1988 03 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,167 $0 Implemented
CO0117 # 02 Y:1988 02 1988 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,702 $139,000 Implemented
CO0116 # 06 Y:1988 06 1988 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $107,194 $100,000 Implemented
CO0116 # 05 Y:1988 05 1988 INSTALL TIMERS AND/OR THERMOSTATS $3,390 $375 Not Implemented
CO0116 # 04 Y:1988 04 1988 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,814 $7,000 Implemented
CO0116 # 02 Y:1988 02 1988 INSTALL / REPAIR INSULATION ON STEAM LINES $753 $18,000 Implemented
CO0116 # 01 Y:1988 01 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $151,329 $7,000 Implemented
CO0115 # 07 Y:1988 07 1988 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,557 $38,200 Implemented
CO0115 # 06 Y:1988 06 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,111 $0 Implemented
CO0115 # 05 Y:1988 05 1988 INSTALL / REPAIR INSULATION ON STEAM LINES $4,410 $10,670 Implemented
CO0115 # 04 Y:1988 04 1988 REDUCE EXCESS STEAM BLEEDING $3,914 $2,000 Implemented
CO0115 # 03 Y:1988 03 1988 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $23,377 $5,000 Implemented