IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 206 Sugar And Confectionery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0800 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,617 $22,400 Implemented
GT0800 # 03 Y:2005 03 2005 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $2,775 $900 Not Implemented
GT0800 # 04 Y:2005 04 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,900 $25,600 Not Implemented
GT0800 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,756 $1,785 Not Implemented
GT0800 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,010 $850 Implemented
GT0800 # 01 Y:2005 01 2005 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $241,590 $283,800 Implemented
TN0671 # 08 Y:1999 08 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $360 $305 Not Implemented
TN0671 # 06 Y:1999 06 1999 OPTIMIZE PLANT POWER FACTOR $4,000 $13,000 Not Implemented
TN0671 # 07 Y:1999 07 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,680 $11,780 Not Implemented
TN0671 # 05 Y:1999 05 1999 SELL / OFFER BY-PRODUCT AS ANIMAL FEED $21,560 $0 Not Implemented
TN0671 # 01 Y:1999 01 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $250,000 $2,030 Not Implemented
TN0671 # 03 Y:1999 03 1999 MODIFY CURRENT INCENTIVE PROGRAM $45,000 $16,375 Not Implemented
TN0671 # 04 Y:1999 04 1999 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $28,195 $1,075 Not Implemented
TN0671 # 02 Y:1999 02 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $108,400 $34,670 Not Implemented
TN0425 # 03 Y:1991 03 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,594 $0 Not Implemented
TN0425 # 02 Y:1991 02 1991 INSTALL SET-BACK TIMERS $20,275 $0 Not Implemented
TN0425 # 01 Y:1991 01 1991 RECOVER WASTE HEAT FROM EQUIPMENT $73,469 $87,400 Not Implemented
TN0425 # 04 Y:1991 04 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,698 $760 Not Implemented
TN0425 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,398 $0 Not Implemented
TN0277 # 06 Y:1986 06 1986 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $264 $111 Not Implemented
TN0277 # 08 Y:1986 08 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $396 $0 Implemented
TN0277 # 09 Y:1986 09 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $661 $440 Implemented
TN0277 # 10 Y:1986 10 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $149 $220 Implemented
TN0277 # 03 Y:1986 03 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $2,251 $500 Implemented
TN0277 # 02 Y:1986 02 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,442 $150 Implemented