IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

63

matching recommendations
Reset
SIC 2062 Cane Sugar Refining
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2314 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,404 $135 n/a
LS2314 # 01 Y:2023 01 2023 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,310 $0 n/a
LS2314 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $3,222 $660 n/a
LS2314 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,651 $11,390 n/a
LS2314 # 05 Y:2023 05 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $25,291 $89,400 n/a
LS2314 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $40,199 $309,000 n/a
LE0411 # 02 Y:2016 02 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,142 $25 Implemented
LE0411 # 11 Y:2016 11 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,246 $16,912 Implemented
LE0411 # 10 Y:2016 10 2016 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $102,584 $458,390 Not Implemented
LE0411 # 08 Y:2016 08 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $58,696 $100,000 Implemented
LE0411 # 01 Y:2016 01 2016 INSTALL TIMERS AND/OR THERMOSTATS $22 $0 Implemented
LE0411 # 03 Y:2016 03 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $3,533 $150 Implemented
LE0411 # 04 Y:2016 04 2016 INSTALL TIMERS AND/OR THERMOSTATS $3,292 $625 Implemented
LE0411 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $21,409 $9,106 Implemented
LE0411 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,675 $1,000 Implemented
LE0411 # 07 Y:2016 07 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $1,450 $1,450 Not Implemented
LE0411 # 09 Y:2016 09 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,849 $6,000 Not Implemented
UM0427 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,442 $10,650 Not Implemented
UM0427 # 03 Y:2013 03 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $21,140 $5,000 Not Implemented
UM0427 # 05 Y:2013 05 2013 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $196,098 $500,000 Not Implemented
UM0427 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,906 $6,500 Implemented
UM0427 # 02 Y:2013 02 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,680 $9,000 Implemented
UM0427 # 06 Y:2013 06 2013 INSTALL EFFICIENT RECTIFIERS $20,863 $12,000 Not Implemented
WV0462 # 01 Y:2013 01 2013 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $298,848 $180,000 Not Implemented
WV0462 # 02 Y:2013 02 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $167,190 $95,000 Not Implemented